← BELCHER BRANCH

BELCHER BRANCH safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5021675

    30 CFR 75.370(a)(1) · $1,818.00 proposed penalty

  2. Roof control plan.

    violationRecord 5099384

    30 CFR 75.220(a)(1) · $5,574.00 proposed penalty

  3. Permissible electric face equipment; maintenance.

    violationRecord 5099383

    30 CFR 75.503 · $549.00 proposed penalty

  4. Drill dust control at underground areas of underground mines.

    violationRecord 5099382

    30 CFR 72.630(b) · $959.00 proposed penalty

  5. Violation — cited standard not reported

    violationRecord 5099381

    $297.00 proposed penalty

  6. Emergency tethers.

    violationRecord 5092544

    30 CFR 75.1714-6 · $2,133.00 proposed penalty

  7. Roof testing and scaling.

    violationRecord 5092543

    30 CFR 75.211(d) · $267.00 proposed penalty

  8. Electric equipment; examination, testing and maintenance.

    violationRecord 5092974

    30 CFR 75.512 · Significant and substantial (S&S) · $9,757.00 proposed penalty

  9. Machinery and equipment; operation and maintenance.

    violationRecord 5092973

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $5,574.00 proposed penalty

  10. Mechanical equipment guards.

    violationRecord 5180166

    30 CFR 75.1722(b) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  11. Protection from falls of roof, face and ribs.

    violationRecord 5180165

    30 CFR 75.202(a) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  12. Multi-gas detectors.

    violationRecord 5180164

    30 CFR 75.1714-7(a) · Significant and substantial (S&S)

  13. Self-rescue devices; use and location requirements.

    violationRecord 5180163

    30 CFR 75.1714-2(c) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  14. Proximity detection systems.

    violationRecord 5092972

    30 CFR 75.1732(a) · Significant and substantial (S&S)

  15. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 5092971

    30 CFR 75.1714-3(a) · $288.00 proposed penalty

  16. Protection of trailing cables.

    violationRecord 5028588

    30 CFR 75.606 · $1,968.00 proposed penalty

  17. Quantity and location of firefighting equipment.

    violationRecord 5028587

    30 CFR 75.1100-2(f) · $267.00 proposed penalty

  18. Protection of trailing cables.

    violationRecord 5021674

    30 CFR 75.606 · Significant and substantial (S&S) · $9,757.00 proposed penalty

  19. Roof control plan.

    violationRecord 5021673

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $29,904.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5021672

    30 CFR 75.370(a)(1) · $1,818.00 proposed penalty

  21. Multi-gas detectors.

    violationRecord 5021671

    30 CFR 75.1714-7(a) · Significant and substantial (S&S) · $41,184.00 proposed penalty

  22. Communications facilities; refuge alternatives.

    violationRecord 5021670

    30 CFR 75.1600-3(a)(1) · $1,679.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 5021669

    30 CFR 75.202(a) · Significant and substantial (S&S) · $21,713.00 proposed penalty

  24. Performing work from a raised position; safeguards.

    violationRecord 5021668

    30 CFR 75.1726(b) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 5021667

    30 CFR 75.202(a) · Significant and substantial (S&S) · $69,055.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.