← BELCHER BRANCH

BELCHER BRANCH safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Proximity detection systems.

    violationRecord 5180188

    30 CFR 75.1732(b)(2) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  2. Preshift examination at fixed intervals.

    violationRecord 5180187

    30 CFR 75.360(b)

  3. Machinery and equipment; operation and maintenance.

    violationRecord 5180186

    30 CFR 75.1725(a) · $226.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 5180185

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 5180184

    30 CFR 75.400

  6. Roof control plan.

    violationRecord 5180183

    30 CFR 75.220(a)(1) · $313.00 proposed penalty

  7. Regular Safety and Health Inspection

    inspectionRecord F021041

    65.8 on-site hours reported

  8. Ventilation controls.

    violationRecord 5180182

    30 CFR 75.333(d)(3) · $165.00 proposed penalty

  9. Permissible electric face equipment; maintenance.

    violationRecord 5180181

    30 CFR 75.503 · $313.00 proposed penalty

  10. Permissible electric face equipment; maintenance.

    violationRecord 5180180

    30 CFR 75.503 · $1,037.00 proposed penalty

  11. Machinery and equipment; operation and maintenance.

    violationRecord 5180179

    30 CFR 75.1725(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  12. Multi-gas detectors.

    violationRecord 5180178

    30 CFR 75.1714-7(a) · $465.00 proposed penalty

  13. Verbal Hazard Complaint Inspections

    inspectionRecord 6322448

    10.5 on-site hours reported

  14. Spot Inspection

    inspectionRecord F02B631

    0.5 on-site hours reported

  15. Mine ventilation plan; submission and approval.

    violationRecord 5028591

    30 CFR 75.370(a)(1) · $755.00 proposed penalty

  16. Power wires and cables; insulation and protection.

    violationRecord 5028590

    30 CFR 75.517 · $549.00 proposed penalty

  17. Spot Inspections

    inspectionRecord F021040

    103(i) · 7.5 on-site hours reported

  18. Escapeway maps.

    violationRecord 5180177

    30 CFR 75.1505(b) · $642.00 proposed penalty

  19. Machinery and equipment; operation and maintenance.

    violationRecord 5180176

    30 CFR 75.1725(a) · $313.00 proposed penalty

  20. Verbal Hazard Complaint Inspections

    inspectionRecord 7048792

    2.8 on-site hours reported

  21. Spot Inspections

    inspectionRecord F0150B6

    103(i) · 3.5 on-site hours reported

  22. Mine ventilation plan; submission and approval.

    violationRecord 5021676

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $11,450.00 proposed penalty

  23. Inspection of fire suppression devices.

    violationRecord 5180031

    30 CFR 75.1107-16(b) · $2,936.00 proposed penalty

  24. Clamping of trailing cables to equipment.

    violationRecord 5180030

    30 CFR 75.605 · $883.00 proposed penalty

  25. Verbal Hazard Complaint Inspections

    inspectionRecord F0150B5

    11.3 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.