Spot Inspection
6.0 on-site hours reported
Spot Inspection
10.5 on-site hours reported
Machinery and equipment; operation and maintenance.
30 CFR 77.404(a) · Significant and substantial (S&S) · $366.00 proposed penalty
Highwalls, pits and spoil banks; plans.
30 CFR 77.1000 · Significant and substantial (S&S) · $818.00 proposed penalty
Quarterly sampling; designated work positions.
30 CFR 71.206(d)(2) · $151.00 proposed penalty
Regular Safety and Health Inspection
46.5 on-site hours reported
Verbal Hazard Complaint Inspections
4.3 on-site hours reported
Sealing of slope or drift openings.
30 CFR 75.1711-2 · Significant and substantial (S&S) · $818.00 proposed penalty
Spot Inspection
2.0 on-site hours reported
Regular Safety and Health Inspection
2.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.