BEAR BRANCH 2 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspections
103(i) · 3.5 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $398.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S) · $2,936.00 proposed penalty
On-shift examination.
30 CFR 75.362(g)(1) · $151.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
30 CFR 75.701 · $313.00 proposed penalty
Communications facilities; refuge alternatives.
30 CFR 75.1600-3(a)(2) · $313.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
30 CFR 75.1714-3(a) · $336.00 proposed penalty
Installation of high-voltage transmission cables.
30 CFR 75.807 · $313.00 proposed penalty
Spot Inspections
103(i) · 4.0 on-site hours reported
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
30 CFR 75.1714-3(a) · $336.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(b)(7) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(j)(2) · $313.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $818.00 proposed penalty
Nonpermissible diesel-powered equipment; electrical system design and performance requirements.
30 CFR 75.1910(j) · $313.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $818.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $818.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Daily examination of hoisting equipment.
30 CFR 77.1403 · $267.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $642.00 proposed penalty
Maintenance of diesel-powered equipment.
30 CFR 75.1914(a) · $267.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
30 CFR 75.701 · $267.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $3,184.00 proposed penalty
On-shift examination.
30 CFR 75.362(b) · $267.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.