← BEAR BRANCH 2

BEAR BRANCH 2 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5081691

    30 CFR 75.370(a)(1) · $549.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5084483

    30 CFR 75.400 · $883.00 proposed penalty

  3. Roof control plan.

    violationRecord 5084662

    30 CFR 75.220(a)(1) · $432.00 proposed penalty

  4. Ventilation controls.

    violationRecord 5084661

    30 CFR 75.333(c)(3)

  5. Permissible electric face equipment; maintenance.

    violationRecord 5084660

    30 CFR 75.503 · Significant and substantial (S&S) · $2,936.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 5084659

    30 CFR 75.400 · $883.00 proposed penalty

  7. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 5084656

    30 CFR 75.701 · $313.00 proposed penalty

  8. Communications facilities; refuge alternatives.

    violationRecord 5084655

    30 CFR 75.1600-3(a) · $313.00 proposed penalty

  9. Mechanical equipment guards.

    violationRecord 5084482

    30 CFR 75.1722(a) · $432.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 5084481

    30 CFR 75.400 · $883.00 proposed penalty

  11. Identification of circuit breakers.

    violationRecord 5084480

    30 CFR 75.904 · $336.00 proposed penalty

  12. Spot Inspections

    inspectionRecord F0142D3

    103(i) · 5.5 on-site hours reported

  13. Accumulation of combustible materials.

    violationRecord 5082319

    30 CFR 75.400 · $883.00 proposed penalty

  14. Escapeways; bituminous and lignite mines.

    violationRecord 5082318

    30 CFR 75.380(d)(1) · Significant and substantial (S&S)

  15. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 5082317

    30 CFR 75.1600-2(e) · $226.00 proposed penalty

  16. Quantity and location of firefighting equipment.

    violationRecord 5084653

    30 CFR 75.1100-2(e) · $313.00 proposed penalty

  17. Other safeguards.

    violationRecord 5084652

    30 CFR 75.1403 · $313.00 proposed penalty

  18. Quantity and location of firefighting equipment.

    violationRecord 5084651

    30 CFR 75.1100-2(e) · $313.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 5082316

    30 CFR 75.400 · $883.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 5084479

    30 CFR 75.400 · $883.00 proposed penalty

  21. On-shift examination.

    violationRecord 5084478

    30 CFR 75.362(b) · $313.00 proposed penalty

  22. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5084477

    30 CFR 75.1731(b) · $336.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5084476

    30 CFR 75.400 · $883.00 proposed penalty

  24. Ventilation controls.

    violationRecord 5084649

    30 CFR 75.333(c)(3) · $336.00 proposed penalty

  25. Identification of circuit breakers.

    violationRecord 5084648

    30 CFR 75.904 · $336.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.