BEAR BRANCH 2 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Availability of approved self-rescue devices; instruction in use and location.
30 CFR 75.1714(a)
Ventilation controls.
30 CFR 75.333(d)(3)
Spot Inspections
103(i) · 4.0 on-site hours reported
Verbal Hazard Complaint Inspections
6.3 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1)
On-shift examination.
30 CFR 75.362(g)(2)(i)
Accumulation of combustible materials.
30 CFR 75.400
Ventilation controls.
30 CFR 75.333(d)(2)
Accumulation of combustible materials.
30 CFR 75.400
Accumulation of combustible materials.
30 CFR 75.400
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S)
Automatic fire sensors and manual actuators; installation; minimum requirements.
30 CFR 75.1107-4(a)(2)
Availability of approved self-rescue devices; instruction in use and location.
30 CFR 75.1714(a)
Roof control plan.
30 CFR 75.220(a)(1)
Spot Inspections
103(i) · 7.0 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1)
Communications.
30 CFR 75.1600
Underground electrical installations.
30 CFR 75.340(a)(1)(i)
Regular Safety and Health Inspection
108.8 on-site hours reported
Mining methods.
30 CFR 75.203(e)(1)
Low- and medium-voltage circuits serving three-phase alternating current equipment; circuit breakers.
30 CFR 75.900
Automatic fire warning devices; actions and response.
30 CFR 75.1103-5(a)(1)
Violation — cited standard not reported
Significant and substantial (S&S)
Spot Inspections
103(i) · 6.0 on-site hours reported
Spot Inspections
103(i) · 7.3 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.