BARRETT MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Maintenance of diesel-powered equipment.
30 CFR 75.1914(a) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · $165.00 proposed penalty
Ventilation Technical Investigation
6.5 on-site hours reported
Regular Safety and Health Inspection
167.8 on-site hours reported
Electrical Technical Investigation
8.5 on-site hours reported
Permissible exposure level.
30 CFR 62.130(a) · $151.00 proposed penalty
Inspection of fire suppression devices.
30 CFR 75.1107-16-b · $151.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $818.00 proposed penalty
Examination and maintenance of firefighting equipment.
30 CFR 77.1110 · $151.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
individual was pick up a piece of low belt structure when EE felt a pop in EE's low back. the individual went off work on 04/06/2026 as a lost time accident
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
30 CFR 75.1714-3(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
228.5 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
30 CFR 75.1107-1(d) · $193.00 proposed penalty
Spot Inspection
13.0 on-site hours reported
Regular Safety and Health Inspection
181.5 on-site hours reported
Ventilation Technical Investigation
6.0 on-site hours reported
Water sprinkler systems; arrangement of sprinklers.
30 CFR 75.1101-8(a) · $151.00 proposed penalty
Water sprinkler systems; arrangement of sprinklers.
30 CFR 75.1101-8(d) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $818.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.