← Bailey Mine

Bailey Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mining machines, cap lamps; requirements.

    violationRecord 9603764

    30 CFR 75.1719-4(b) · $151.00 proposed penalty

  2. Roof control plan.

    violationRecord 9601869

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 9601868

    30 CFR 75.400 · $177.00 proposed penalty

  4. Roof bolting.

    violationRecord 9604297

    30 CFR 75.204(f)(7) · $245.00 proposed penalty

  5. Spot Inspections

    inspectionRecord F00BA84

    103(i) · 7.0 on-site hours reported

  6. Mine ventilation plan; submission and approval.

    violationRecord 9604332

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  7. Methane monitors.

    violationRecord 9604331

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  8. Escapeways; bituminous and lignite mines.

    violationRecord 9604296

    30 CFR 75.380(d)(7)(vii)(B) · Significant and substantial (S&S)

  9. Other safeguards.

    violationRecord 9604295

    30 CFR 75.1403 · $165.00 proposed penalty

  10. Ventilation controls.

    violationRecord 9604294

    30 CFR 75.333(d)(3) · $151.00 proposed penalty

  11. Maintenance of incombustible content of rock dust.

    violationRecord 9604484

    30 CFR 75.403 · $151.00 proposed penalty

  12. Maintenance of incombustible content of rock dust.

    violationRecord 9604483

    30 CFR 75.403 · $151.00 proposed penalty

  13. Other safeguards.

    violationRecord 9604482

    30 CFR 75.1403 · $366.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 9604481

    30 CFR 75.400 · $398.00 proposed penalty

  15. Belt air course ventilation.

    violationRecord 9604480

    30 CFR 75.350(a)(2) · $151.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 9604479

    30 CFR 75.400 · $398.00 proposed penalty

  17. Other safeguards.

    violationRecord 9604330

    30 CFR 75.1403 · $165.00 proposed penalty

  18. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9604329

    30 CFR 75.1731(b) · $151.00 proposed penalty

  19. Identification of circuit breakers.

    violationRecord 9604328

    30 CFR 75.904 · $151.00 proposed penalty

  20. Roof bolting.

    violationRecord 9604293

    30 CFR 75.204(f)(7) · $245.00 proposed penalty

  21. Other safeguards.

    violationRecord 9604292

    30 CFR 75.1403 · $366.00 proposed penalty

  22. Maintenance of incombustible content of rock dust.

    violationRecord 9604291

    30 CFR 75.403 · $313.00 proposed penalty

  23. Inspection of fire suppression devices.

    violationRecord 9603209

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  24. Evaluation and revision of roof control plan.

    violationRecord 9602109

    30 CFR 75.223(b)(1) · $151.00 proposed penalty

  25. Quantity and location of firefighting equipment.

    violationRecord 9602108

    30 CFR 75.1100-2(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.