← Bailey Mine

Bailey Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord F00BA8F

    103(i) · 6.5 on-site hours reported

  2. Regular Safety and Health Inspection

    inspectionRecord F00BA8E

    1,694.0 on-site hours reported

  3. Maintenance of incombustible content of rock dust.

    violationRecord 9604607

    30 CFR 75.403 · $151.00 proposed penalty

  4. Ventilation controls.

    violationRecord 9604352

    30 CFR 75.333(h) · $151.00 proposed penalty

  5. Electric equipment; examination, testing and maintenance.

    violationRecord 9604351

    30 CFR 75.512 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  6. Electric equipment; examination, testing and maintenance.

    violationRecord 9604350

    30 CFR 75.512 · $151.00 proposed penalty

  7. Other safeguards.

    violationRecord 9604349

    30 CFR 75.1403 · $245.00 proposed penalty

  8. Mechanical equipment guards.

    violationRecord 9604348

    30 CFR 75.1722(a) · $193.00 proposed penalty

  9. Ventilation Technical Investigation

    inspectionRecord 6229776

    0.0 on-site hours reported

  10. Spot Inspections

    inspectionRecord F00BA8D

    103(i) · 8.5 on-site hours reported

  11. Maintenance of incombustible content of rock dust.

    violationRecord 9604444

    30 CFR 75.403 · $151.00 proposed penalty

  12. Verbal Hazard Complaint Inspections

    inspectionRecord F00BA8C

    14.0 on-site hours reported

  13. Spot Inspections

    inspectionRecord F011F8B

    103(i) · 7.0 on-site hours reported

  14. Electric wiring and equipment; installation and maintenance.

    violationRecord 9602012

    30 CFR 77.516 · $151.00 proposed penalty

  15. Guarding of cables.

    violationRecord 9604565

    30 CFR 75.816(a)(2) · $151.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F00BA8B

    103(i) · 6.5 on-site hours reported

  17. Accumulation of combustible materials.

    violationRecord 9604564

    30 CFR 75.400 · $151.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 9604563

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  19. Escapeways; bituminous and lignite mines.

    violationRecord 9604605

    30 CFR 75.380(d)(7)(vii) · $151.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 9604604

    30 CFR 75.400 · $151.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 9604562

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  22. Methane monitors.

    violationRecord 9604443

    30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $432.00 proposed penalty

  23. Other safeguards.

    violationRecord 9602011

    30 CFR 75.1403 · $245.00 proposed penalty

  24. Methane monitors.

    violationRecord 9602010

    30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $432.00 proposed penalty

  25. Inspection of fire suppression devices.

    violationRecord 9602009

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.