Bailey Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Accumulation of combustible materials.
30 CFR 75.400 · $288.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Spot Inspections
103(i) · 6.5 on-site hours reported
Water, sediment, or slurry impoundments and impounding structures; general.
30 CFR 77.216(d) · $193.00 proposed penalty
Transformers; installation and guarding.
30 CFR 77.509(c) · $151.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(b) · $151.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(b) · $209.00 proposed penalty
Openings in surface installations; safeguards.
30 CFR 77.204 · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $151.00 proposed penalty
Daily examination of hoisting equipment.
30 CFR 77.1403(a)(2) · $193.00 proposed penalty
Surface installations; general.
30 CFR 77.200 · $193.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
30 CFR 75.1103-4(b) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $288.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Identification of circuit breakers.
30 CFR 75.904 · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(3) · $193.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
6.5 on-site hours reported
Spot Inspections
103(i) · 4.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $288.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Performing work from a raised position; safeguards.
30 CFR 75.1726(b) · $151.00 proposed penalty
Handling of materials
No dys awy frm wrk,no rstr act
Accident narrative
Employee retrieving a piece of steel plate from plate rack. While bending over another piece of punch plate contacted employee causing laceration to employees left cheek. No Lost time or restrictions. 4 Stitches administered.
Escapeway maps.
30 CFR 75.1505(b) · $151.00 proposed penalty
Cable fittings; suitability.
30 CFR 75.515 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.