Bailey Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Escapeway maps.
30 CFR 75.1505(a)(3) · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $151.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(3) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Inspection of fire suppression devices.
30 CFR 75.1107-16(b) · $151.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(b) · $151.00 proposed penalty
Striking or bumping
No dys awy frm wrk,no rstr act
Accident narrative
Employee was walking between a piece of equipment and the coal rib, when they struck their right forearm on an installed rib strap causing a laceration. The laceration was treated with 5 stitches, employee returned to work with no lost work days
Handling of materials
Days away from work only
Accident narrative
Employee was cleaning rock off of the top of the miner when a piece of rock slid off of the miner head and struck them on the right foot. Employee was diagnosed with a fracture to their little toe (metatarsal)and subsequently taken off of work
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iv) · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(3) · $193.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c)(3) · $267.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(a) · Significant and substantial (S&S) · $432.00 proposed penalty
Spot Inspections
103(i) · 5.5 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
30 CFR 77.502 · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.