Bailey Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Dry chemical devices; capacity; minimum requirements.
30 CFR 75.1107-9(a)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $1,431.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $193.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Protection of trailing cables.
30 CFR 75.606 · $151.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
30 CFR 75.1103-4(b) · $193.00 proposed penalty
Ventilation controls.
30 CFR 75.333(e)(1)(ii) · $193.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $288.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Daily examination of hoisting equipment.
30 CFR 75.1400-3(b)(3) · $193.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $592.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $1,431.00 proposed penalty
Fall of roof or back
Accident only
Accident narrative
An unintentional roof fall occurred in the 14L miner section. This was located in the #2 belt entry between #1 and the #2 crosscut. The fall measured approximately 65ft long 16ft wide and 20ft high. The fall occurred as a result of faulted area due to horizontal stress that occurred causing the strata to separate. No injury or equipment damage as a result of this incident.
Spot Inspections
103(i) · 2.0 on-site hours reported
Non-Injury Accident Investigation
15.0 on-site hours reported
Mechanical equipment guards.
30 CFR 75.1722(a) · $288.00 proposed penalty
Protection of trailing cables.
30 CFR 75.606 · $151.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
30 CFR 75.601-1 · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.