← Bailey Mine

Bailey Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof bolting.

    violationRecord 9602166

    30 CFR 75.204(f)(7) · $193.00 proposed penalty

  2. Methane monitors.

    violationRecord 9602165

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  3. Electric equipment; examination, testing and maintenance.

    violationRecord 9602052

    30 CFR 75.512 · $245.00 proposed penalty

  4. Inspection of fire suppression devices.

    violationRecord 9602051

    30 CFR 75.1107-16(a) · $193.00 proposed penalty

  5. Frequency of examinations.

    violationRecord 9602050

    30 CFR 75.512-2 · $193.00 proposed penalty

  6. Ventilation controls.

    violationRecord 9605634

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  7. Maintenance of incombustible content of rock dust.

    violationRecord 9605633

    30 CFR 75.403 · $151.00 proposed penalty

  8. Maintenance of incombustible content of rock dust.

    violationRecord 9605632

    30 CFR 75.403 · $151.00 proposed penalty

  9. Other safeguards.

    violationRecord 9605627

    30 CFR 75.1403

  10. Quarterly sampling; mechanized mining units.

    violationRecord 9603239

    30 CFR 70.208(e)(3) · $151.00 proposed penalty

  11. Spot Inspections

    inspectionRecord F000433

    103(i) · 7.3 on-site hours reported

  12. Roof bolting.

    violationRecord 9602164

    30 CFR 75.204(f)(7) · $193.00 proposed penalty

  13. Ventilation controls.

    violationRecord 9605589

    30 CFR 75.333(h) · $151.00 proposed penalty

  14. Spot Inspections

    inspectionRecord F000432

    103(i) · 6.8 on-site hours reported

  15. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9603238

    30 CFR 75.1731(b) · $151.00 proposed penalty

  16. Roof Control Technical Investigation

    inspectionRecord F00BB53

    13.0 on-site hours reported

  17. Travelways at surface installations.

    violationRecord 9604714

    30 CFR 77.205(b) · $193.00 proposed penalty

  18. Travelways at surface installations.

    violationRecord 9604713

    30 CFR 77.205(b) · $193.00 proposed penalty

  19. Escapeways; bituminous and lignite mines.

    violationRecord 9605631

    30 CFR 75.380(d)(7)(i) · $151.00 proposed penalty

  20. Ventilation controls.

    violationRecord 9605588

    30 CFR 75.333(h) · $151.00 proposed penalty

  21. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9605587

    30 CFR 75.1731(b) · $151.00 proposed penalty

  22. Fire suppression devices; extinguishant supply systems.

    violationRecord 9605586

    30 CFR 75.1107-8(a)(2) · $151.00 proposed penalty

  23. Mechanical equipment guards.

    violationRecord 9605585

    30 CFR 75.1722(a) · $288.00 proposed penalty

  24. Other safeguards.

    violationRecord 9602163

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,431.00 proposed penalty

  25. Permissible electric face equipment; maintenance.

    violationRecord 9602162

    30 CFR 75.503 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.