Bailey Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspections
103(i) · 6.0 on-site hours reported
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $165.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $209.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $209.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $209.00 proposed penalty
Roof testing and scaling.
30 CFR 75.211(d) · $151.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
30 CFR 75.701 · $366.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $366.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $209.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $267.00 proposed penalty
Mining machines, cap lamps; requirements.
30 CFR 75.1719-4(b) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $209.00 proposed penalty
Slip or fall of person
Days away from work only
Accident narrative
Employee was operating an excavator on a hillside. The employee stepped out of the equipment and when they stepped onto the ground they slipped on ice and fell on left shoulder. Incident occurred on 01-06-2026, however, initial doctors assessment did not show any injuries or restrictions. Follow up assessment was conducted today 02-03-2026 and a scan showed a torn muscle.
Disconnecting devices.
30 CFR 75.903 · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $177.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $209.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(d) · $818.00 proposed penalty
Examination and maintenance of firefighting equipment.
30 CFR 77.1110 · $818.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $151.00 proposed penalty
Spot Inspections
103(i) · 7.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $209.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $151.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
30 CFR 75.1103-4(b) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $209.00 proposed penalty
Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.
30 CFR 50.20(a) · $177.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.