Bailey Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Roof control plan.
30 CFR 75.220(a)(1) · $226.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · $288.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $165.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $226.00 proposed penalty
Fall of roof or back
No dys awy frm wrk,no rstr act
Accident narrative
Employee was side bolting when a rock fell from above the rib protector striking EE causing lacerations. EE was treated with sutures to close the lacerations. EE was released to work EE's next scheduled shift.
Verbal Hazard Complaint Inspections
14.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $165.00 proposed penalty
Spot Inspections
103(i) · 5.0 on-site hours reported
Slip or fall of person
Days away from work only
Accident narrative
IE slipped while descending some steps in the prep plant. IE did not maintain three points of contact while on the stairs. Injury was not the result of a training or compliance issue.
Handling of materials
No dys awy frm wrk,no rstr act
Accident narrative
Employee was spraying with a hose under tail drive on belt. EE stood up and a chain swinging from overhead structure accidentally hit EE in mouth and chipped a couple teeth.
Verbal Hazard Complaint Inspections
7.0 on-site hours reported
Spot Inspections
103(i) · 6.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $288.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $151.00 proposed penalty
Identification of circuit breakers.
30 CFR 75.904 · $642.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $432.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(k) · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $288.00 proposed penalty
Worked-out areas and areas where pillars are being recovered.
30 CFR 75.334(b)(1) · $288.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Health Technical Investigation
9.8 on-site hours reported
Spot Inspections
103(i) · 5.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.