← Bailey Mine

Bailey Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 7104310

    30 CFR 75.400 · $226.00 proposed penalty

  2. Roof control plan.

    violationRecord 9121315

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  3. Bath houses and toilet facilities.

    violationRecord 9121314

    30 CFR 75.1712 · $151.00 proposed penalty

  4. Electric equipment; examination, testing and maintenance.

    violationRecord 9121313

    30 CFR 75.512 · $151.00 proposed penalty

  5. Ventilation controls.

    violationRecord 8059346

    30 CFR 75.333(h) · $151.00 proposed penalty

  6. Examination and maintenance of firefighting equipment.

    violationRecord 8059345

    30 CFR 77.1110 · $151.00 proposed penalty

  7. Maintenance of incombustible content of rock dust.

    violationRecord 8025719

    30 CFR 75.403 · $398.00 proposed penalty

  8. Maintenance of incombustible content of rock dust.

    violationRecord 8025718

    30 CFR 75.403 · $398.00 proposed penalty

  9. Loading and haulage equipment; operation.

    violationRecord 9187724

    30 CFR 77.1607(n) · Significant and substantial (S&S) · $209.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 9939934

    30 CFR 75.400 · $226.00 proposed penalty

  11. Mechanical equipment guards.

    violationRecord 9939933

    30 CFR 75.1722(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  12. Condition and examination of firefighting equipment.

    violationRecord 9188259

    30 CFR 75.1100-3 · $245.00 proposed penalty

  13. Electric equipment; examination, testing and maintenance.

    violationRecord 9126272

    30 CFR 75.512 · $465.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 9122781

    30 CFR 75.400 · $504.00 proposed penalty

  15. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 8025717

    30 CFR 75.701 · $151.00 proposed penalty

  16. On-shift examination.

    violationRecord 8025716

    30 CFR 75.362(g)(2)(i) · $151.00 proposed penalty

  17. Ventilation controls.

    violationRecord 8025715

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  18. Other safeguards.

    violationRecord 8025712

    30 CFR 75.1403 · $177.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F01536F

    103(i) · 8.0 on-site hours reported

  20. Accumulation of combustible materials.

    violationRecord 9939932

    30 CFR 75.400 · $226.00 proposed penalty

  21. Power wires and cables; insulation and protection.

    violationRecord 9939931

    30 CFR 75.517 · Significant and substantial (S&S) · $549.00 proposed penalty

  22. Underground electrical installations.

    violationRecord 8056000

    30 CFR 75.340(a)(1)(i) · $151.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 8055999

    30 CFR 75.202(a) · $151.00 proposed penalty

  24. Permissible electric face equipment; maintenance.

    violationRecord 8055998

    30 CFR 75.503 · $151.00 proposed penalty

  25. Inspection of fire suppression devices.

    violationRecord 8055997

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.