← Augusta Plant

Augusta Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F0249DC

    18.0 on-site hours reported

  2. Regular Safety and Health Inspection

    inspectionRecord F01A9E2

    14.0 on-site hours reported

  3. Horns and backup alarms.

    violationRecord 5001751

    30 CFR 56.14132(a) · $151.00 proposed penalty

  4. Regular Safety and Health Inspection

    inspectionRecord 4198914

    11.0 on-site hours reported

  5. Machinery

    accidentRecord 220251290011

    No dys awy frm wrk,no rstr act

    Accident narrative

    The accident occurred when employee was attempting to get a hammer disassemble in a set of jaws. They put a spacer piece in to help the jaws grip better on the hammer, and the spacer piece split into pieces. One of the steel chips struck and lodged into employee's arms. The entry site bled but was wrapped up and the employee finished the job they were working on.

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.