  1. Identification of power switches.

    violationRecord 5175105

    30 CFR 56.12018 · $504.00 proposed penalty

  2. Inspection and cover plates.

    violationRecord 5175104

    30 CFR 56.12032 · $755.00 proposed penalty

  3. Identification of power switches.

    violationRecord 5175103

    30 CFR 56.12018 · $504.00 proposed penalty

  4. Inspection and cover plates.

    violationRecord 5175102

    30 CFR 56.12032 · $1,679.00 proposed penalty

  5. Regular Safety and Health Inspection

    inspectionRecord F031D54

    14.3 on-site hours reported

  6. Regular Safety and Health Inspection

    inspectionRecord F02DD99

    9.0 on-site hours reported

  7. Safety defects; examination, correction and records.

    violationRecord 5000985

    30 CFR 56.14100(b) · $151.00 proposed penalty

  8. Inspection and cover plates.

    violationRecord 5000984

    30 CFR 56.12032 · Significant and substantial (S&S) · $2,503.00 proposed penalty

  9. Combustible waste.

    violationRecord 5000983

    30 CFR 56.4104(b) · $151.00 proposed penalty

  10. Inspection and cover plates.

    violationRecord 5000982

    30 CFR 56.12032 · $151.00 proposed penalty

  11. Spot Inspection

    inspectionRecord F01745B

    12.3 on-site hours reported

  12. Housekeeping.

    violationRecord 5000849

    30 CFR 56.20003(b) · Significant and substantial (S&S) · $336.00 proposed penalty

  13. Regular Safety and Health Inspection

    inspectionRecord F00C751

    11.0 on-site hours reported

  14. Protection of gas cylinder valves.

    violationRecord 5000848

    30 CFR 56.16006 · $151.00 proposed penalty

  15. Conveyor start-up warnings.

    violationRecord 5000847

    30 CFR 56.14201(b) · $151.00 proposed penalty

  16. Protection for openings around travelways.

    violationRecord 5000846

    30 CFR 56.11012 · $151.00 proposed penalty

  17. Non-Fatal Accident Investigation

    inspectionRecord F00C750

    7.8 on-site hours reported

  18. Operators stations.

    violationRecord 5000475

    30 CFR 56.14103(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  19. New task training.

    violationRecord 5000474

    30 CFR 46.7(a) · Significant and substantial (S&S) · $374.00 proposed penalty

  20. Protection for openings around travelways.

    violationRecord 5000473

    30 CFR 56.11012 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  21. Handrails and toeboards.

    violationRecord 5000472

    30 CFR 56.11002 · Significant and substantial (S&S) · $336.00 proposed penalty

  22. Regular Safety and Health Inspection

    inspectionRecord 6935189

    17.3 on-site hours reported

  23. Construction and maintenance of ladders.

    violationRecord 5000471

    30 CFR 56.11003 · $151.00 proposed penalty

  24. Inspection.

    violationRecord 5000470

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  25. Moving machine parts.

    violationRecord 5000469

    30 CFR 56.14107(a) · $592.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.