Safety activity
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $1,431.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 56.12008 · $959.00 proposed penalty
Identification of power switches.
30 CFR 56.12018 · $288.00 proposed penalty
Inspection and cover plates.
30 CFR 56.12032 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(b) · $432.00 proposed penalty
Regular Safety and Health Inspection
13.0 on-site hours reported
Handling of materials
No dys awy frm wrk,no rstr act
Accident narrative
Was changing a hydraulic motor on telesmith while loosening bolts my finger got smashed while holding bottom nut removing bolts .
Construction and maintenance of ladders.
30 CFR 56.11003 · $151.00 proposed penalty
Protection of gas cylinder valves.
30 CFR 56.16006 · $151.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $245.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $151.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(b) · $151.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
11.0 on-site hours reported
Annual refresher training.
30 CFR 46.8 · $165.00 proposed penalty
Annual refresher training.
30 CFR 46.8 · $168.00 proposed penalty
Self-propelled equipment.
30 CFR 56.4230(a) · $151.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $151.00 proposed penalty
Requirement for container labels.
30 CFR 47.41(a) · $151.00 proposed penalty
General requirements.
30 CFR 56.4200(b)(2) · $151.00 proposed penalty
Written safety program.
30 CFR 56.23002(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
15.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.