  1. Housekeeping.

    violationRecord 5060083

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $12,403.00 proposed penalty

  2. Housekeeping.

    violationRecord 5060082

    30 CFR 56.20003(a) · $1,126.00 proposed penalty

  3. Construction and maintenance of guards.

    violationRecord 5060081

    30 CFR 56.14112(b) · $3,184.00 proposed penalty

  4. Construction and maintenance of guards.

    violationRecord 5060080

    30 CFR 56.14112(b) · $3,184.00 proposed penalty

  5. Construction and maintenance of guards.

    violationRecord 5060079

    30 CFR 56.14112(b) · $3,448.00 proposed penalty

  6. Air receiver tanks.

    violationRecord 9825187

    30 CFR 56.13011 · $549.00 proposed penalty

  7. Construction and maintenance of ladders.

    violationRecord 5060077

    30 CFR 56.11003 · $245.00 proposed penalty

  8. Construction and maintenance of guards.

    violationRecord 9825186

    30 CFR 56.14112(b) · $2,133.00 proposed penalty

  9. Protection for openings around travelways.

    violationRecord 9825185

    30 CFR 56.11012 · $549.00 proposed penalty

  10. Inspection and cover plates.

    violationRecord 5060076

    30 CFR 56.12032 · $1,968.00 proposed penalty

  11. Construction and maintenance of guards.

    violationRecord 5060075

    30 CFR 56.14112(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  12. Housekeeping.

    violationRecord 9825184

    30 CFR 56.20003(a) · $2,503.00 proposed penalty

  13. Moving machine parts.

    violationRecord 9825183

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $14,557.00 proposed penalty

  14. Air receiver tanks.

    violationRecord 9825182

    30 CFR 56.13011 · $549.00 proposed penalty

  15. Dust control.

    violationRecord 5060074

    30 CFR 56.9315 · $549.00 proposed penalty

  16. Illumination of surface working areas.

    violationRecord 5060073

    30 CFR 56.17001 · $549.00 proposed penalty

  17. High-pressure hose connections.

    violationRecord 5060072

    30 CFR 56.13021 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  18. Inspection and cover plates.

    violationRecord 5060071

    30 CFR 56.12032 · $1,968.00 proposed penalty

  19. Housekeeping.

    violationRecord 5060070

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $12,403.00 proposed penalty

  20. Safe access.

    violationRecord 9825180

    30 CFR 56.11001 · $7,084.00 proposed penalty

  21. Safety belts and lines.

    violationRecord 5060078

    30 CFR 56.15005 · Significant and substantial (S&S) · $86,008.00 proposed penalty

  22. Violation — cited standard not reported

    violationRecord 5060069
  23. Safe access.

    violationRecord 5060068

    30 CFR 56.11001 · $2,133.00 proposed penalty

  24. Electrical conductors.

    violationRecord 5060067

    30 CFR 56.12004 · $2,133.00 proposed penalty

  25. Housekeeping.

    violationRecord 5060066

    30 CFR 56.20003(a) · $2,503.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.