Amrize Ste Genevieve Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Temporary, portable containers.

    violationRecord 5016216

    30 CFR 47.44(b) · $165.00 proposed penalty

  2. Moving machine parts.

    violationRecord 5011658

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  3. Housekeeping.

    violationRecord 5011657

    30 CFR 56.20003(a) · $465.00 proposed penalty

  4. Housekeeping.

    violationRecord 9789791

    30 CFR 56.20003(a) · $504.00 proposed penalty

  5. Construction and maintenance of guards.

    violationRecord 9789790

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $818.00 proposed penalty

  6. Housekeeping.

    violationRecord 5016215

    30 CFR 56.20003(a) · $504.00 proposed penalty

  7. Electrical conductors.

    violationRecord 5016214

    30 CFR 56.12004 · $1,679.00 proposed penalty

  8. Inspection and cover plates.

    violationRecord 5016213

    30 CFR 56.12032 · $549.00 proposed penalty

  9. Construction and maintenance of guards.

    violationRecord 5012055

    30 CFR 56.14112(b) · $165.00 proposed penalty

  10. Housekeeping.

    violationRecord 5012054

    30 CFR 56.20003(a) · $504.00 proposed penalty

  11. Temporary, portable containers.

    violationRecord 5011656

    30 CFR 47.44(b) · $165.00 proposed penalty

  12. Insulation and fittings for power wires and cables.

    violationRecord 5011655

    30 CFR 56.12008 · $549.00 proposed penalty

  13. Correction of dangerous conditions.

    violationRecord 5011654

    30 CFR 56.12030 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  14. Guarding around lights.

    violationRecord 5012053

    30 CFR 56.12034 · $193.00 proposed penalty

  15. Insulation and fittings for power wires and cables.

    violationRecord 5011653

    30 CFR 56.12008 · $193.00 proposed penalty

  16. Correction of dangerous conditions.

    violationRecord 5011652

    30 CFR 56.12030 · $193.00 proposed penalty

  17. Insulation and fittings for power wires and cables.

    violationRecord 9789785

    30 CFR 56.12008 · $642.00 proposed penalty

  18. Electrical conductors.

    violationRecord 9789784

    30 CFR 56.12004 · Significant and substantial (S&S) · $10,569.00 proposed penalty

  19. Housekeeping.

    violationRecord 9789783

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  20. Inspection and cover plates.

    violationRecord 9789782

    30 CFR 56.12032 · $642.00 proposed penalty

  21. Housekeeping.

    violationRecord 9789781

    30 CFR 56.20003(a) · $642.00 proposed penalty

  22. Housekeeping.

    violationRecord 9789780

    30 CFR 56.20003(a) · $642.00 proposed penalty

  23. Construction and maintenance of guards.

    violationRecord 5016208

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  24. Housekeeping.

    violationRecord 5016207

    30 CFR 56.20003(a) · $642.00 proposed penalty

  25. Housekeeping.

    violationRecord 5016206

    30 CFR 56.20003(a) · $642.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.