← AMRIZE RAVENA PLANT

AMRIZE RAVENA PLANT safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Housekeeping.

    violationRecord 9809056

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $883.00 proposed penalty

  2. Ventilation and shielding for welding.

    violationRecord 9809055

    30 CFR 56.14213(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  3. Identification of power switches.

    violationRecord 9807771

    30 CFR 56.12018 · $151.00 proposed penalty

  4. General requirements.

    violationRecord 9807770

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

  5. Insulation and fittings for power wires and cables.

    violationRecord 9809054

    30 CFR 56.12008 · $267.00 proposed penalty

  6. Protection for openings around travelways.

    violationRecord 9809052

    30 CFR 56.11012 · $151.00 proposed penalty

  7. Safe access.

    violationRecord 9809051

    30 CFR 56.11001 · $151.00 proposed penalty

  8. Brakes.

    violationRecord 9807769

    30 CFR 56.14101(a)(2) · $151.00 proposed penalty

  9. Inspection.

    violationRecord 9807768

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  10. Unguarded conveyors with adjacent travelways.

    violationRecord 9809126

    30 CFR 56.14109(b)(3) · $151.00 proposed penalty

  11. Moving machine parts.

    violationRecord 9809125

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $592.00 proposed penalty

  12. Safety defects; examination, correction and records.

    violationRecord 9809050

    30 CFR 56.14100(b) · $151.00 proposed penalty

  13. Safety defects; examination, correction and records.

    violationRecord 9809049

    30 CFR 56.14100(b) · $151.00 proposed penalty

  14. Requirement for container labels.

    violationRecord 9809048

    30 CFR 47.41(a)(1) · $151.00 proposed penalty

  15. Correction of dangerous conditions.

    violationRecord 9807767

    30 CFR 56.12030 · $151.00 proposed penalty

  16. Snow and ice on walkways and travelways.

    violationRecord 9807766

    30 CFR 56.11016 · Significant and substantial (S&S) · $883.00 proposed penalty

  17. Snow and ice on walkways and travelways.

    violationRecord 9807765

    30 CFR 56.11016 · Significant and substantial (S&S) · $883.00 proposed penalty

  18. Handrails and toeboards.

    violationRecord 9807586

    30 CFR 56.11002 · Significant and substantial (S&S) · $7,084.00 proposed penalty

  19. Regular Safety and Health Inspection

    inspectionRecord F013E84

    180.0 on-site hours reported

  20. Insulation and fittings for power wires and cables.

    violationRecord 9809124

    30 CFR 56.12008 · $151.00 proposed penalty

  21. Housekeeping.

    violationRecord 9809122

    30 CFR 56.20003(b) · $177.00 proposed penalty

  22. Work on power circuits.

    violationRecord 9809121

    30 CFR 56.12017 · Significant and substantial (S&S) · $1,320.00 proposed penalty

  23. Insulation and fittings for power wires and cables.

    violationRecord 9809120

    30 CFR 56.12008 · $151.00 proposed penalty

  24. Inspection and cover plates.

    violationRecord 9809119

    30 CFR 56.12032 · $193.00 proposed penalty

  25. Inspection.

    violationRecord 9809118

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.