Amrize Portland Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Electrical conductors.

    violationRecord 5057045

    30 CFR 56.12004 · $3,736.00 proposed penalty

  2. Inspection.

    violationRecord 5057044

    30 CFR 56.4201(a)(2) · Significant and substantial (S&S) · $267.00 proposed penalty

  3. Requirement for container labels.

    violationRecord 5057043

    30 CFR 47.41(a)(1) · $465.00 proposed penalty

  4. Testing grounding systems.

    violationRecord 5057042

    30 CFR 56.12028 · $4,383.00 proposed penalty

  5. Combustible waste.

    violationRecord 5056795

    30 CFR 56.4104(b) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  6. Warning signs.

    violationRecord 5056794

    30 CFR 56.4101 · $697.00 proposed penalty

  7. Construction and maintenance of guards.

    violationRecord 5056793

    30 CFR 56.14112(b) · $697.00 proposed penalty

  8. Construction and maintenance of guards.

    violationRecord 5056792

    30 CFR 56.14112(a)(2) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  9. Construction and maintenance of guards.

    violationRecord 5056734

    30 CFR 56.14112(b) · $697.00 proposed penalty

  10. Protection for openings around travelways.

    violationRecord 5056733

    30 CFR 56.11012 · $697.00 proposed penalty

  11. Testing grounding systems.

    violationRecord 5056732

    30 CFR 56.12028 · $1,320.00 proposed penalty

  12. Safety defects; examination, correction and records.

    violationRecord 5056731

    30 CFR 56.14100(b) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  13. Electrical conductors.

    violationRecord 5056730

    30 CFR 56.12004 · Significant and substantial (S&S) · $5,574.00 proposed penalty

  14. Testing grounding systems.

    violationRecord 5056729

    30 CFR 56.12028 · $592.00 proposed penalty

  15. Housekeeping.

    violationRecord 5056728

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $8,315.00 proposed penalty

  16. Safe access.

    violationRecord 5056791

    30 CFR 56.11001 · Significant and substantial (S&S) · $64,882.00 proposed penalty

  17. Construction and maintenance of guards.

    violationRecord 5056790

    30 CFR 56.14112(b) · $697.00 proposed penalty

  18. High-pressure hose connections.

    violationRecord 5056789

    30 CFR 56.13021 · $465.00 proposed penalty

  19. Housekeeping.

    violationRecord 5056788

    30 CFR 56.20003(a) · $1,679.00 proposed penalty

  20. Housekeeping.

    violationRecord 5056787

    30 CFR 56.20003(a) · $1,679.00 proposed penalty

  21. Regular Safety and Health Inspection

    inspectionRecord F010E29

    127.5 on-site hours reported

  22. Special Emphasis Programs

    inspectionRecord F00424A

    1.0 on-site hours reported

  23. Spot Inspection

    inspectionRecord F00424C

    0.0 on-site hours reported

  24. Safety defects; examination, correction and records.

    violationRecord 6941229

    30 CFR 56.14100(b) · $592.00 proposed penalty

  25. Barricades and warning signs.

    violationRecord 6941227

    30 CFR 56.20011 · $883.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.