← Amrize Portland Plant

Amrize Portland Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Electrical conductors.

    violationRecord 5057237

    30 CFR 56.12004 · $3,736.00 proposed penalty

  2. Requirement for container labels.

    violationRecord 5054298

    30 CFR 47.41(a) · $1,550.00 proposed penalty

  3. Parking procedures for unattended equipment.

    violationRecord 5054297

    30 CFR 56.14207

  4. Electric substations and liquid storage facilities.

    violationRecord 6947762

    30 CFR 56.4130(b) · $1,550.00 proposed penalty

  5. Unguarded conveyors with adjacent travelways.

    violationRecord 6947761

    30 CFR 56.14109(a) · $697.00 proposed penalty

  6. Handrails and toeboards.

    violationRecord 6947760

    30 CFR 56.11002 · Significant and substantial (S&S) · $7,676.00 proposed penalty

  7. Moving machine parts.

    violationRecord 6947759

    30 CFR 56.14107(a) · $465.00 proposed penalty

  8. Storage of hazardous materials.

    violationRecord 5057236

    30 CFR 56.16003

  9. Unguarded conveyors with adjacent travelways.

    violationRecord 5057235

    30 CFR 56.14109(a) · $697.00 proposed penalty

  10. Inspection and cover plates.

    violationRecord 5057234

    30 CFR 56.12032 · $465.00 proposed penalty

  11. Construction and maintenance of guards.

    violationRecord 5057233

    30 CFR 56.14112(b) · $1,431.00 proposed penalty

  12. Warning signs.

    violationRecord 5057232

    30 CFR 56.4101 · $697.00 proposed penalty

  13. High-pressure hose connections.

    violationRecord 5057231

    30 CFR 56.13021 · Significant and substantial (S&S)

  14. Construction and maintenance of guards.

    violationRecord 6947758

    30 CFR 56.14112(a)(1) · $2,133.00 proposed penalty

  15. Moving machine parts.

    violationRecord 6947757

    30 CFR 56.14107(a)

  16. Construction and maintenance of guards.

    violationRecord 6947756

    30 CFR 56.14112(a)(1) · $2,133.00 proposed penalty

  17. Examination of working places.

    violationRecord 6947755

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $14,557.00 proposed penalty

  18. Housekeeping.

    violationRecord 5057230

    30 CFR 56.20003(a) · $8,315.00 proposed penalty

  19. Insulation and fittings for power wires and cables.

    violationRecord 5057229

    30 CFR 56.12008 · $883.00 proposed penalty

  20. General requirements.

    violationRecord 5057228

    30 CFR 56.4200(b)(2) · $883.00 proposed penalty

  21. Parking procedures for unattended equipment.

    violationRecord 5054296

    30 CFR 56.14207 · $1,968.00 proposed penalty

  22. Warning signs.

    violationRecord 5054295

    30 CFR 56.4101 · $1,968.00 proposed penalty

  23. Requirement for container labels.

    violationRecord 5054294

    30 CFR 47.41(a) · $1,968.00 proposed penalty

  24. First-aid materials.

    violationRecord 5054293

    30 CFR 56.15001 · Significant and substantial (S&S) · $4,383.00 proposed penalty

  25. Storage of hazardous materials.

    violationRecord 5054292

    30 CFR 56.16003 · $592.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.