← Amrize Midlothian Plant

Amrize Midlothian Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Work on electrically-powered equipment.

    violationRecord 9795723

    30 CFR 56.12016 · Significant and substantial (S&S) · $697.00 proposed penalty

  2. Inspection.

    violationRecord 9795722

    30 CFR 56.4201(a)(1) · $288.00 proposed penalty

  3. Testing grounding systems.

    violationRecord 9795721

    30 CFR 56.12028 · $288.00 proposed penalty

  4. Storage of hazardous materials.

    violationRecord 9795720

    30 CFR 56.16003 · $288.00 proposed penalty

  5. Insulation and fittings for power wires and cables.

    violationRecord 9795719

    30 CFR 56.12008 · $288.00 proposed penalty

  6. Moving machine parts.

    violationRecord 5004088

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  7. Construction and maintenance of guards.

    violationRecord 5004087

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  8. Moving machine parts.

    violationRecord 5004086

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  9. Construction and maintenance of guards.

    violationRecord 5004085

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  10. Guarding around lights.

    violationRecord 5004084

    30 CFR 56.12034 · $288.00 proposed penalty

  11. Distribution boxes.

    violationRecord 5004083

    30 CFR 56.12006 · $288.00 proposed penalty

  12. Inspection and cover plates.

    violationRecord 5002938

    30 CFR 56.12032 · $883.00 proposed penalty

  13. Electrical conductors.

    violationRecord 5002937

    30 CFR 56.12004 · $959.00 proposed penalty

  14. Electrical conductors.

    violationRecord 5002936

    30 CFR 56.12004 · $959.00 proposed penalty

  15. Inspection and cover plates.

    violationRecord 5002935

    30 CFR 56.12032 · $883.00 proposed penalty

  16. Construction and maintenance of guards.

    violationRecord 5002934

    30 CFR 56.14112(a)(1) · $432.00 proposed penalty

  17. Correction of dangerous conditions.

    violationRecord 5002933

    30 CFR 56.12030 · Significant and substantial (S&S) · $4,749.00 proposed penalty

  18. Moving machine parts.

    violationRecord 5002932

    30 CFR 56.14107(a) · $432.00 proposed penalty

  19. Moving machine parts.

    violationRecord 5002931

    30 CFR 56.14107(a) · $432.00 proposed penalty

  20. General requirements.

    violationRecord 9795718

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

  21. Insulation and fittings for power wires and cables.

    violationRecord 9795717

    30 CFR 56.12008 · $151.00 proposed penalty

  22. Correction of dangerous conditions.

    violationRecord 5004082

    30 CFR 56.12030 · $366.00 proposed penalty

  23. General requirements.

    violationRecord 5004081

    30 CFR 56.4200(b)(2) · $366.00 proposed penalty

  24. Air receiver tanks.

    violationRecord 5004080

    30 CFR 56.13011 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  25. Portable rigid ladders.

    violationRecord 5004079

    30 CFR 56.11004 · $366.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.