← Amrize Holly Hill Plant

Amrize Holly Hill Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Housekeeping.

    violationRecord 5065840

    30 CFR 56.20003(b) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  2. Housekeeping.

    violationRecord 5065839

    30 CFR 56.20003(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  3. Housekeeping.

    violationRecord 5065838

    30 CFR 56.20003(b) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  4. Inspection and cover plates.

    violationRecord 5065837

    30 CFR 56.12032 · $313.00 proposed penalty

  5. Housekeeping.

    violationRecord 5065836

    30 CFR 56.20003(b) · $1,037.00 proposed penalty

  6. Housekeeping.

    violationRecord 5065835

    30 CFR 56.20003(b) · $1,037.00 proposed penalty

  7. Identification of power switches.

    violationRecord 5065834

    30 CFR 56.12018 · $1,037.00 proposed penalty

  8. Housekeeping.

    violationRecord 5065833

    30 CFR 56.20003(b) · $1,037.00 proposed penalty

  9. Verbal Hazard Complaint Inspections

    inspectionRecord F02CAC6

    2.0 on-site hours reported

  10. Compliance Follow-up Inspection

    inspectionRecord F02CAC5

    0.0 on-site hours reported

  11. Compliance Follow-up Inspection

    inspectionRecord F02CAC2

    5.0 on-site hours reported

  12. Safe access.

    violationRecord 5065781

    30 CFR 56.11001 · Significant and substantial (S&S) · $3,736.00 proposed penalty

  13. Construction and maintenance of guards.

    violationRecord 5066121

    30 CFR 56.14112(b) · $209.00 proposed penalty

  14. Inspection and cover plates.

    violationRecord 5066120

    30 CFR 56.12032 · $151.00 proposed penalty

  15. Safety defects; examination, correction and records.

    violationRecord 5066119

    30 CFR 56.14100(b) · $151.00 proposed penalty

  16. Securing gas cylinders.

    violationRecord 5065770

    30 CFR 56.16005 · $1,679.00 proposed penalty

  17. Inspection and cover plates.

    violationRecord 5065769

    30 CFR 56.12032 · Significant and substantial (S&S) · $7,676.00 proposed penalty

  18. Housekeeping.

    violationRecord 5065768

    30 CFR 56.20003(b) · $504.00 proposed penalty

  19. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5063644

    30 CFR 50.30(a) · $151.00 proposed penalty

  20. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5063643

    30 CFR 50.30(a) · $151.00 proposed penalty

  21. Distribution boxes.

    violationRecord 5066117

    30 CFR 56.12006 · $642.00 proposed penalty

  22. Brakes.

    violationRecord 5066116

    30 CFR 56.14101(a)(2) · $151.00 proposed penalty

  23. Parking procedures for unattended equipment.

    violationRecord 5066115

    30 CFR 56.14207 · $151.00 proposed penalty

  24. Safety belts and lines.

    violationRecord 5066114

    30 CFR 56.15005 · $151.00 proposed penalty

  25. Brakes.

    violationRecord 5066113

    30 CFR 56.14101(a)(2) · $2,133.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.