← Amrize Holly Hill Plant

Amrize Holly Hill Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Inspection and cover plates.

    violationRecord 5193093

    30 CFR 56.12032 · $226.00 proposed penalty

  2. Closure of valves.

    violationRecord 5193092

    30 CFR 56.4603 · $226.00 proposed penalty

  3. Illumination of surface working areas.

    violationRecord 5065849

    30 CFR 56.17001 · $755.00 proposed penalty

  4. Housekeeping.

    violationRecord 5063353

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  5. Housekeeping.

    violationRecord 5063352

    30 CFR 56.20003(a) · $226.00 proposed penalty

  6. Machinery, equipment, and tools.

    violationRecord 5063351

    30 CFR 56.14205 · $755.00 proposed penalty

  7. Moving machine parts.

    violationRecord 5193091

    30 CFR 56.14107(a) · $193.00 proposed penalty

  8. Housekeeping.

    violationRecord 5065848

    30 CFR 56.20003(c) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  9. Barricades and warning signs.

    violationRecord 5065847

    30 CFR 56.20011 · $883.00 proposed penalty

  10. Electrical conductors.

    violationRecord 5065846

    30 CFR 56.12004 · $883.00 proposed penalty

  11. Housekeeping.

    violationRecord 5065845

    30 CFR 56.20003(b) · $883.00 proposed penalty

  12. Construction and maintenance of guards.

    violationRecord 5065844

    30 CFR 56.14112(b) · $398.00 proposed penalty

  13. Safe access.

    violationRecord 5065843

    30 CFR 56.11001 · $398.00 proposed penalty

  14. Housekeeping.

    violationRecord 5065842

    30 CFR 56.20003(b) · $883.00 proposed penalty

  15. Insulation and fittings for power wires and cables.

    violationRecord 5063350

    30 CFR 56.12008 · $883.00 proposed penalty

  16. Protection for openings around travelways.

    violationRecord 5063349

    30 CFR 56.11012 · $883.00 proposed penalty

  17. Air receiver tanks.

    violationRecord 5063348

    30 CFR 56.13011 · $883.00 proposed penalty

  18. Regular Safety and Health Inspection

    inspectionRecord F0444F7

    149.0 on-site hours reported

  19. Housekeeping.

    violationRecord 5193090

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  20. Temporary, portable containers.

    violationRecord 5193089

    30 CFR 47.44(b) · $313.00 proposed penalty

  21. Housekeeping.

    violationRecord 5193088

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  22. Housekeeping.

    violationRecord 5193087

    30 CFR 56.20003(a) · $313.00 proposed penalty

  23. Housekeeping.

    violationRecord 5193086

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  24. Barricades and warning signs.

    violationRecord 5193085

    30 CFR 56.20011 · $1,037.00 proposed penalty

  25. Construction and maintenance of guards.

    violationRecord 5065841

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $7,676.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.