← Amrize Fredonia Quarry

Amrize Fredonia Quarry safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Circuit overload protection.

    violationRecord 9760496

    30 CFR 56.12001 · $151.00 proposed penalty

  2. Correction of dangerous conditions.

    violationRecord 9760495

    30 CFR 56.12030 · $151.00 proposed penalty

  3. Inspection and cover plates.

    violationRecord 5041660

    30 CFR 56.12032 · Significant and substantial (S&S) · $642.00 proposed penalty

  4. Moving machine parts.

    violationRecord 5041659

    30 CFR 56.14107(a) · $151.00 proposed penalty

  5. Housekeeping.

    violationRecord 5041658

    30 CFR 56.20003(b) · $151.00 proposed penalty

  6. Brakes.

    violationRecord 5041657

    30 CFR 56.14101(a)(2) · $151.00 proposed penalty

  7. Extinguisher recharging or replacement.

    violationRecord 5041656

    30 CFR 56.4203 · $151.00 proposed penalty

  8. Horns and backup alarms.

    violationRecord 5041655

    30 CFR 56.14132(b)(2) · $151.00 proposed penalty

  9. Dust control.

    violationRecord 5041654

    30 CFR 56.9315 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  10. Brakes.

    violationRecord 5041650

    30 CFR 56.14101(a)(2) · $151.00 proposed penalty

  11. Electrical conductors.

    violationRecord 5041649

    30 CFR 56.12004 · $151.00 proposed penalty

  12. Electrical conductors.

    violationRecord 5041648

    30 CFR 56.12004 · $151.00 proposed penalty

  13. Locking transformer enclosures.

    violationRecord 5041647

    30 CFR 56.12068 · $151.00 proposed penalty

  14. Self-propelled equipment.

    violationRecord 5041646

    30 CFR 56.4230(a)(2) · $151.00 proposed penalty

  15. Spillage and leakage.

    violationRecord 5041645

    30 CFR 56.4102 · $151.00 proposed penalty

  16. Safety defects; examination, correction and records.

    violationRecord 5041644

    30 CFR 56.14100(b) · $151.00 proposed penalty

  17. Insulation and fittings for power wires and cables.

    violationRecord 5041643

    30 CFR 56.12008 · $151.00 proposed penalty

  18. Housekeeping.

    violationRecord 5041642

    30 CFR 56.20003(b) · $151.00 proposed penalty

  19. Flying or falling materials.

    violationRecord 5041641

    30 CFR 56.14110 · Significant and substantial (S&S) · $755.00 proposed penalty

  20. Identification of power switches.

    violationRecord 5041400

    30 CFR 56.12018 · $151.00 proposed penalty

  21. Insulation and fittings for power wires and cables.

    violationRecord 5041399

    30 CFR 56.12008 · $151.00 proposed penalty

  22. Electrical conductors.

    violationRecord 5041398

    30 CFR 56.12004 · Significant and substantial (S&S) · $755.00 proposed penalty

  23. Regular Safety and Health Inspection

    inspectionRecord F008FF2

    103.0 on-site hours reported

  24. Berms or guardrails.

    violationRecord 5041397

    30 CFR 56.9300(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  25. Safety defects; examination, correction and records.

    violationRecord 5041012

    30 CFR 56.14100(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.