Requirements for written safety program.
30 CFR 57.23003(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
61.3 on-site hours reported
Check-in, check-out system.
30 CFR 57.11058 · $883.00 proposed penalty
Escape routes.
30 CFR 57.11051(b) · $288.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · Significant and substantial (S&S) · $432.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(1) · $151.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(2) · $151.00 proposed penalty
Inspection and cover plates.
30 CFR 57.12032 · $151.00 proposed penalty
Provision and maintenance of self-rescue devices.
30 CFR 57.15030 · $1,431.00 proposed penalty
Inspection.
30 CFR 57.4201(a)(2) · $432.00 proposed penalty
Check-in, check-out system.
30 CFR 57.11058 · $193.00 proposed penalty
Regular Safety and Health Inspection
72.8 on-site hours reported
Check-in, check-out system.
30 CFR 57.11058 · $151.00 proposed penalty
Correction of hazardous conditions.
30 CFR 57.3200 · Significant and substantial (S&S) · $245.00 proposed penalty
Examination of ground conditions.
30 CFR 57.3401 · $288.00 proposed penalty
Warning signs.
30 CFR 57.4101 · $151.00 proposed penalty
Electrical conductors.
30 CFR 57.12004 · $151.00 proposed penalty
Regular Safety and Health Inspection
74.0 on-site hours reported
Unguarded conveyors with adjacent travelways.
30 CFR 57.14109(a) · $151.00 proposed penalty
Testing grounding systems.
30 CFR 57.12028 · $151.00 proposed penalty
Requirement for container labels.
30 CFR 47.41(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
30 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
30 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
30 CFR 50.30(a) · $151.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
30 CFR 50.30(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.