← Alden Resources Harps Creek

Alden Resources Harps Creek safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Disconnecting devices.

    violationRecord 8325199

    30 CFR 75.903 · $151.00 proposed penalty

  2. Inspection and cover plates.

    violationRecord 5081623

    30 CFR 77.512 · $151.00 proposed penalty

  3. Electrical connections or splices; suitability.

    violationRecord 5081622

    30 CFR 77.504 · $151.00 proposed penalty

  4. Drill dust control at underground areas of underground mines.

    violationRecord 3794094

    30 CFR 72.630(b) · Significant and substantial (S&S) · $288.00 proposed penalty

  5. Protection from falls of roof, face and ribs.

    violationRecord 3794093

    30 CFR 75.202(a) · Significant and substantial (S&S) · $177.00 proposed penalty

  6. Mining methods.

    violationRecord 3794092

    30 CFR 75.203(a) · $151.00 proposed penalty

  7. Ventilation controls.

    violationRecord 3794091

    30 CFR 75.333(b)(1) · $151.00 proposed penalty

  8. Identification of circuit breakers and disconnecting switches.

    violationRecord 3794090

    30 CFR 77.809 · $151.00 proposed penalty

  9. Electric equipment; examination, testing and maintenance.

    violationRecord 3794089

    30 CFR 75.512 · $151.00 proposed penalty

  10. Escapeways; bituminous and lignite mines.

    violationRecord 3794088

    30 CFR 75.380(d)(7)(iv) · $151.00 proposed penalty

  11. Escapeways; bituminous and lignite mines.

    violationRecord 3790160

    30 CFR 75.380(d)(7)(iv) · $151.00 proposed penalty

  12. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 3790159

    30 CFR 75.1731(a) · $151.00 proposed penalty

  13. Loading and haulage equipment; installations.

    violationRecord 3790158

    30 CFR 77.1605(k) · $151.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord F00A208

    154.5 on-site hours reported

  15. Spot Inspection

    inspectionRecord F00DC7A

    4.0 on-site hours reported

  16. Spot Inspection

    inspectionRecord F015D7C

    5.0 on-site hours reported

  17. Spot Inspection

    inspectionRecord F005356

    5.5 on-site hours reported

  18. Non-Injury Accident Investigation

    inspectionRecord F014C76

    28.5 on-site hours reported

  19. Roof control plan.

    violationRecord 9779039

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  20. Violation — cited standard not reported

    violationRecord 9779036
  21. Roof control plan.

    violationRecord 9779038

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  22. Additional information on mine map.

    violationRecord 9776595

    30 CFR 75.1200-1(b) · $151.00 proposed penalty

  23. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 5082717

    30 CFR 75.1911(h) · $151.00 proposed penalty

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5082716

    30 CFR 75.1731(a) · $151.00 proposed penalty

  25. Weekly examination.

    violationRecord 5082715

    30 CFR 75.364(g) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.