← AFFINITY MINE

AFFINITY MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 5020790

    30 CFR 75.400 · $151.00 proposed penalty

  2. Electric equipment; examination, testing and maintenance.

    violationRecord 5020789

    30 CFR 75.512 · $151.00 proposed penalty

  3. Maintenance of incombustible content of rock dust.

    violationRecord 5020788

    30 CFR 75.403 · $366.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5020787

    30 CFR 75.400 · $267.00 proposed penalty

  5. Roof control plan.

    violationRecord 5020786

    30 CFR 75.220(a)(1) · $288.00 proposed penalty

  6. Protection from falls of roof, face and ribs.

    violationRecord 5020785

    30 CFR 75.202(a) · $177.00 proposed penalty

  7. Maintenance of incombustible content of rock dust.

    violationRecord 5025487

    30 CFR 75.403 · $336.00 proposed penalty

  8. Roof control plan.

    violationRecord 5020784

    30 CFR 75.220(a)(1) · $193.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5020783

    30 CFR 75.400 · $151.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 5020782

    30 CFR 75.400 · $245.00 proposed penalty

  11. Protection from falls of roof, face and ribs.

    violationRecord 5020781

    30 CFR 75.202(a) · $151.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5020780

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  13. Other safeguards.

    violationRecord 5020779

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5020777

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F020DBB

    103(i) · 8.5 on-site hours reported

  16. Clamping of trailing cables to equipment.

    violationRecord 5133900

    30 CFR 75.605 · $151.00 proposed penalty

  17. Protection from falls of roof, face and ribs.

    violationRecord 5020776

    30 CFR 75.202(a) · $177.00 proposed penalty

  18. Roof control plan.

    violationRecord 5020775

    30 CFR 75.220(a)(1) · $288.00 proposed penalty

  19. Dry chemical devices; capacity; minimum requirements.

    violationRecord 5020774

    30 CFR 75.1107-9(a)(1) · $226.00 proposed penalty

  20. Verbal Hazard Complaint Inspections

    inspectionRecord F010B59

    8.0 on-site hours reported

  21. Other safeguards.

    violationRecord 5020773

    30 CFR 75.1403 · $151.00 proposed penalty

  22. Escapeways; bituminous and lignite mines.

    violationRecord 5020772

    30 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty

  23. Spot Inspections

    inspectionRecord F020DB8

    103(i) · 6.0 on-site hours reported

  24. Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities.

    violationRecord 5020315

    30 CFR 75.1712-3(c)(1)(i) · $151.00 proposed penalty

  25. Escapeways; bituminous and lignite mines.

    violationRecord 5020314

    30 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.