← AFFINITY MINE

AFFINITY MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord F01AAB6

    103(i) · 6.5 on-site hours reported

  2. Preshift examination at fixed intervals.

    violationRecord 5095143

    30 CFR 75.360(g) · $151.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 5095142

    30 CFR 75.400 · $177.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 5095141

    30 CFR 75.202(a) · Significant and substantial (S&S) · $366.00 proposed penalty

  5. Maintenance of incombustible content of rock dust.

    violationRecord 5095140

    30 CFR 75.403 · $151.00 proposed penalty

  6. Spot Inspections

    inspectionRecord F01FF30

    103(i) · 9.5 on-site hours reported

  7. Mine ventilation plan; submission and approval.

    violationRecord 5095139

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 5095138

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5095137

    30 CFR 75.400 · $151.00 proposed penalty

  10. Rock dusting.

    violationRecord 5095135

    30 CFR 75.402 · $1,679.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 5095134

    30 CFR 75.400 · $592.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5095133

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $755.00 proposed penalty

  13. Roof control plan.

    violationRecord 5021653

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5021651

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $15,768.00 proposed penalty

  15. Roof control plan.

    violationRecord 5095132

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $549.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F00C0A1

    103(i) · 7.0 on-site hours reported

  17. Mine ventilation plan; submission and approval.

    violationRecord 5025211

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  18. Permissible electric face equipment; maintenance.

    violationRecord 5025210

    30 CFR 75.503 · $313.00 proposed penalty

  19. Respirable dust standards.

    violationRecord 5021649

    30 CFR 70.100(a)(2) · Significant and substantial (S&S) · $504.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5095127

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  21. Ventilation controls.

    violationRecord 5095126

    30 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty

  22. Permissible electric face equipment; maintenance.

    violationRecord 5020122

    30 CFR 75.503 · $151.00 proposed penalty

  23. Mining methods.

    violationRecord 5020121

    30 CFR 75.203(b) · $226.00 proposed penalty

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5095125

    30 CFR 75.1731(a) · $151.00 proposed penalty

  25. Spot Inspections

    inspectionRecord F020A61

    103(i) · 8.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.