← #9A

#9A safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord 6426491

    103(i) · 4.0 on-site hours reported

  2. Spot Inspections

    inspectionRecord F01513E

    103(i) · 7.0 on-site hours reported

  3. Spot Inspections

    inspectionRecord F0142B4

    103(i) · 4.0 on-site hours reported

  4. Installation of main mine fans.

    violationRecord 5084408

    30 CFR 75.310(a)(3) · $151.00 proposed penalty

  5. Air quality detectors and measurement devices.

    violationRecord 5084407

    30 CFR 75.320(a) · $151.00 proposed penalty

  6. Inspection of fire suppression devices.

    violationRecord 5084406

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  7. Spot Inspections

    inspectionRecord F0006FA

    103(i) · 5.5 on-site hours reported

  8. Spot Inspections

    inspectionRecord F0006F6

    103(i) · 12.5 on-site hours reported

  9. Non-Injury Accident Investigation

    inspectionRecord F0006F7

    2.0 on-site hours reported

  10. Violation — cited standard not reported

    violationRecord 9779108
  11. Weekly examination.

    violationRecord 9779110

    30 CFR 75.364(b)(4) · $151.00 proposed penalty

  12. Sampling and monitoring requirements.

    violationRecord 9779109

    30 CFR 75.336(b)(2) · $151.00 proposed penalty

  13. Smoking; prohibition.

    violationRecord 5084405

    30 CFR 75.1702 · $151.00 proposed penalty

  14. Permissible electric face equipment; maintenance.

    violationRecord 5084404

    30 CFR 75.503 · $151.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F000389

    103(i) · 6.0 on-site hours reported

  16. Air quality detectors and measurement devices.

    violationRecord 9779062

    30 CFR 75.320(a) · $151.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5084403

    30 CFR 75.400 · $151.00 proposed penalty

  18. Quantity and location of firefighting equipment.

    violationRecord 5084402

    30 CFR 75.1100-2(b) · $151.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5084401

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  20. Quantity and location of firefighting equipment.

    violationRecord 9778889

    30 CFR 75.1100-2(b) · $151.00 proposed penalty

  21. Warning devices.

    violationRecord 9778888

    30 CFR 75.208 · $151.00 proposed penalty

  22. Sampling and monitoring requirements.

    violationRecord 9778887

    30 CFR 75.336(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  23. Preshift examination at fixed intervals.

    violationRecord 9778886

    30 CFR 75.360(b)(10) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  24. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 5084400

    30 CFR 75.1101-10 · $151.00 proposed penalty

  25. Condition and examination of firefighting equipment.

    violationRecord 9778885

    30 CFR 75.1100-3 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.