← 88 Strip

88 Strip safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Loading and haulage equipment; installations.

    violationRecord 9214924

    30 CFR 77.1605(b) · $151.00 proposed penalty

  2. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9272136

    30 CFR 77.1606(c) · $151.00 proposed penalty

  3. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9214923

    30 CFR 77.1606(c) · $151.00 proposed penalty

  4. Machinery and equipment; operation and maintenance.

    violationRecord 9272135

    30 CFR 77.404(a) · Significant and substantial (S&S) · $883.00 proposed penalty

  5. Accumulations of combustible materials.

    violationRecord 9272134

    30 CFR 77.1104 · $151.00 proposed penalty

  6. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9272133

    30 CFR 77.1606(c) · $151.00 proposed penalty

  7. Highwalls, pits and spoil banks; plans.

    violationRecord 9272132

    30 CFR 77.1000 · Significant and substantial (S&S) · $1,968.00 proposed penalty

  8. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9272131

    30 CFR 77.1606(c) · $151.00 proposed penalty

  9. Drilling; general.

    violationRecord 9272130

    30 CFR 77.1007(b) · $151.00 proposed penalty

  10. Highwalls, pits and spoil banks; plans.

    violationRecord 9272129

    30 CFR 77.1000 · Significant and substantial (S&S) · $883.00 proposed penalty

  11. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F0171A3

    5.0 on-site hours reported

  12. Regular Safety and Health Inspection

    inspectionRecord F0171A2

    294.3 on-site hours reported

  13. Special Emphasis Programs

    inspectionRecord 4134812

    1.0 on-site hours reported

  14. Loading and haulage equipment; installations.

    violationRecord 8285650

    30 CFR 77.1605(b) · $151.00 proposed penalty

  15. Mobile equipment; automatic warning devices.

    violationRecord 8285649

    30 CFR 77.410(a) · Significant and substantial (S&S) · $336.00 proposed penalty

  16. Quantity and location of firefighting equipment.

    violationRecord 8284562

    30 CFR 77.1109(c)(1) · $151.00 proposed penalty

  17. Loading and haulage equipment; inspection and maintenance.

    violationRecord 8284561

    30 CFR 77.1606(c) · $151.00 proposed penalty

  18. Loading and haulage equipment; inspection and maintenance.

    violationRecord 8285648

    30 CFR 77.1606(c) · $151.00 proposed penalty

  19. Loading and haulage equipment; inspection and maintenance.

    violationRecord 8285647

    30 CFR 77.1606(c) · $151.00 proposed penalty

  20. Loading and haulage equipment; inspection and maintenance.

    violationRecord 8285646

    30 CFR 77.1606(c) · $151.00 proposed penalty

  21. Regular Safety and Health Inspection

    inspectionRecord F009D86

    177.0 on-site hours reported

  22. Spot Inspection

    inspectionRecord F009D7E

    4.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.