Violation — cited standard not reported
Regular Safety and Health Inspection
96.0 on-site hours reported
Spot Inspection
4.5 on-site hours reported
Accumulations of combustible materials.
30 CFR 77.1104 · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
14.0 on-site hours reported
Machinery and equipment; operation and maintenance.
30 CFR 77.404(a) · Significant and substantial (S&S) · $313.00 proposed penalty
Accumulations of combustible materials.
30 CFR 77.1104 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $151.00 proposed penalty
Highwalls, pits and spoil banks; plans.
30 CFR 77.1000 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Spot Inspection
10.5 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · Significant and substantial (S&S) · $465.00 proposed penalty
Non-Fatal Accident Investigation
24.5 on-site hours reported
Powered haulage
Days away from work only
Accident narrative
The Rock Truck bed was in raised position when emp went let the bed down it started down normal then free fell about halfway down. Emp said EE hit EE's head on the cab but was fine, EE then went to the ER and was released to go back to work 12/24/25. EE then went to PMC Primary Care on 12/29/25 where they excused EE from work until EE sees a neurologist and they release EE.
Loading and haulage equipment; installations.
30 CFR 77.1605(d) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 77.404(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
30 CFR 77.410(c) · Significant and substantial (S&S) · $151.00 proposed penalty
Regular Safety and Health Inspection
74.8 on-site hours reported
Warning signs; smoking and open flame.
30 CFR 77.1102 · $151.00 proposed penalty
Storage of materials.
30 CFR 77.208(d) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
30 CFR 77.410(c) · Significant and substantial (S&S) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · Significant and substantial (S&S) · $193.00 proposed penalty
Drill dust control at surface mines and surface areas of underground mines.
30 CFR 72.620 · Significant and substantial (S&S) · $209.00 proposed penalty
Highwalls, pits and spoil banks; plans.
30 CFR 77.1000 · $151.00 proposed penalty
Accumulations of combustible materials.
30 CFR 77.1104 · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
30 CFR 77.410(c) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.