← 680-S1

680-S1 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 9778425

    30 CFR 50.30(a)

  2. Spot Inspection

    inspectionRecord F022175

    21.0 on-site hours reported

  3. Verbal Hazard Complaint Inspections

    inspectionRecord F014C84

    4.0 on-site hours reported

  4. Spot Inspection

    inspectionRecord F00E6E3

    0.8 on-site hours reported

  5. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9779935

    30 CFR 77.1606(c) · $151.00 proposed penalty

  6. Drilling; general.

    violationRecord 9779934

    30 CFR 77.1007(b) · $151.00 proposed penalty

  7. Drill dust control at surface mines and surface areas of underground mines.

    violationRecord 9779933

    30 CFR 72.620 · $151.00 proposed penalty

  8. Verbal Hazard Complaint Inspections

    inspectionRecord F00E6E2

    13.0 on-site hours reported

  9. Accumulations of combustible materials.

    violationRecord 8933279

    30 CFR 77.1104 · $151.00 proposed penalty

  10. Loading and haulage equipment; inspection and maintenance.

    violationRecord 8933278

    30 CFR 77.1606(c) · $151.00 proposed penalty

  11. Loading and haulage equipment; inspection and maintenance.

    violationRecord 8933277

    30 CFR 77.1606(c) · $151.00 proposed penalty

  12. Loading and haulage equipment; inspection and maintenance.

    violationRecord 8933276

    30 CFR 77.1606(c) · $151.00 proposed penalty

  13. Accumulations of combustible materials.

    violationRecord 5088569

    30 CFR 77.1104 · $151.00 proposed penalty

  14. Warning signs; smoking and open flame.

    violationRecord 5088568

    30 CFR 77.1102 · $151.00 proposed penalty

  15. Mechanical equipment guards.

    violationRecord 5088567

    30 CFR 77.400(a) · Significant and substantial (S&S) · $313.00 proposed penalty

  16. Examination and maintenance of firefighting equipment.

    violationRecord 5088566

    30 CFR 77.1110 · $151.00 proposed penalty

  17. Examination and maintenance of firefighting equipment.

    violationRecord 5088565

    30 CFR 77.1110 · $151.00 proposed penalty

  18. Loading and haulage equipment; installations.

    violationRecord 9778423

    30 CFR 77.1605(d) · $151.00 proposed penalty

  19. Travelways at surface installations.

    violationRecord 9778422

    30 CFR 77.205(a) · $151.00 proposed penalty

  20. Accumulations of combustible materials.

    violationRecord 9778421

    30 CFR 77.1104 · $151.00 proposed penalty

  21. Highwalls, pits and spoil banks; plans.

    violationRecord 5088325

    30 CFR 77.1000 · Significant and substantial (S&S) · $642.00 proposed penalty

  22. Examination and maintenance of firefighting equipment.

    violationRecord 9778420

    30 CFR 77.1110 · $151.00 proposed penalty

  23. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9778419

    30 CFR 77.1606(c) · $151.00 proposed penalty

  24. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9778418

    30 CFR 77.1606(c) · $151.00 proposed penalty

  25. Non-Injury Accident Investigation

    inspectionRecord F01A3C3

    76.8 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.