63 Mobile 1 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Compliance Follow-up Inspection
2.0 on-site hours reported
Independent contractor register.
30 CFR 45.4(b)
Regular Safety and Health Inspection
15.0 on-site hours reported
Site-specific hazard awareness training.
30 CFR 46.11(a) · Significant and substantial (S&S)
Newly hired experienced miner training.
30 CFR 46.6 · Significant and substantial (S&S)
Training plans.
30 CFR 46.3(a) · $151.00 proposed penalty
Newly hired experienced miner training.
30 CFR 46.6 · Significant and substantial (S&S) · $407.00 proposed penalty
Examination of working places.
30 CFR 56.18002(a) · Significant and substantial (S&S)
Securing movable parts.
30 CFR 56.14206(b)
Berms or guardrails.
30 CFR 56.9300(b) · Significant and substantial (S&S)
Berms or guardrails.
30 CFR 56.9300(a) · Significant and substantial (S&S)
Regular Safety and Health Inspection
5.5 on-site hours reported
Electrical conductors.
30 CFR 56.12004 · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 56.12008 · $151.00 proposed penalty
Safe access.
30 CFR 56.11001 · Significant and substantial (S&S) · $151.00 proposed penalty
Protection for openings around travelways.
30 CFR 56.11012 · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(d) · $151.00 proposed penalty
Brakes.
30 CFR 56.14101(a)(3) · $151.00 proposed penalty
Testing grounding systems.
30 CFR 56.12028 · $151.00 proposed penalty
Regular Safety and Health Inspection
11.5 on-site hours reported
Moving machine parts.
30 CFR 56.14107(a) · $151.00 proposed penalty
Special Emphasis Programs
0.5 on-site hours reported
Compliance Follow-up Inspection
1.3 on-site hours reported
Seat belts for haulage trucks.
30 CFR 56.14131(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 56.12008 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.