← 400 CONE PLANT (Trenhaile Quarry)

400 CONE PLANT (Trenhaile Quarry) safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F0293F2

    12.3 on-site hours reported

  2. General requirements.

    violationRecord 9697800

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

  3. Electrical conductors.

    violationRecord 9697799

    30 CFR 56.12004 · $151.00 proposed penalty

  4. Electrical conductors.

    violationRecord 9697798

    30 CFR 56.12004 · $151.00 proposed penalty

  5. Warning signs.

    violationRecord 9697797

    30 CFR 56.4101 · $151.00 proposed penalty

  6. Inspection.

    violationRecord 9697796

    30 CFR 56.4201(a)(1) · $151.00 proposed penalty

  7. Inspection.

    violationRecord 9697795

    30 CFR 56.4201(a)(1) · $151.00 proposed penalty

  8. Electrical conductors.

    violationRecord 5112401

    30 CFR 56.12004 · $151.00 proposed penalty

  9. Spot Inspection

    inspectionRecord F03C232

    0.5 on-site hours reported

  10. Securing gas cylinders.

    violationRecord 5114650

    30 CFR 56.16005 · $151.00 proposed penalty

  11. Horns and backup alarms.

    violationRecord 5114106

    30 CFR 56.14132(b)(1)(i) · $398.00 proposed penalty

  12. Inspection.

    violationRecord 5114105

    30 CFR 56.4201(a)(1) · $151.00 proposed penalty

  13. Moving machine parts.

    violationRecord 5114104

    30 CFR 56.14107(a) · $151.00 proposed penalty

  14. Parking procedures for unattended equipment.

    violationRecord 5114103

    30 CFR 56.14207 · $151.00 proposed penalty

  15. Regular Safety and Health Inspection

    inspectionRecord F02FF1F

    15.5 on-site hours reported

  16. Inspection and cover plates.

    violationRecord 9697611

    30 CFR 56.12032 · $151.00 proposed penalty

  17. Safe access.

    violationRecord 9697610

    30 CFR 56.11001 · Significant and substantial (S&S) · $177.00 proposed penalty

  18. Berms or guardrails.

    violationRecord 9697609

    30 CFR 56.9300(b) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  19. Safety defects; examination, correction and records.

    violationRecord 9697608

    30 CFR 56.14100(c) · Significant and substantial (S&S) · $592.00 proposed penalty

  20. Extinguisher recharging or replacement.

    violationRecord 9697607

    30 CFR 56.4203 · $151.00 proposed penalty

  21. General requirements.

    violationRecord 9697606

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

  22. Slip or fall of person

    accidentRecord 220250830010

    Days away from work only

    Accident narrative

    Miner slipped as they were getting into the haul truck due to icy conditions. Miner caught themselves from falling and pulled muscles and tendons in their arm and shoulder area.

  23. Requirement for container labels.

    violationRecord 9697605

    30 CFR 47.41(a) · $151.00 proposed penalty

  24. Warning signs.

    violationRecord 9697604

    30 CFR 56.4101 · $151.00 proposed penalty

  25. Requirement for container labels.

    violationRecord 9697603

    30 CFR 47.41(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.