209 Strip & Bank Job safety activity
MSHA violations, accident reports and inspections.
Safety activity
Compliance Follow-up Inspection
0.0 on-site hours reported
Compliance Follow-up Inspection
1.0 on-site hours reported
Compliance Follow-up Inspection
5.0 on-site hours reported
Travelways at surface installations.
30 CFR 77.205(a) · $151.00 proposed penalty
Bathing facilities; change rooms; sanitary flush toilet facilities.
30 CFR 71.400 · $151.00 proposed penalty
Status change reports.
30 CFR 71.209(a)
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(a) · $151.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(d) · $151.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(k) · Significant and substantial (S&S)
Regular Safety and Health Inspection
42.8 on-site hours reported
Protective clothing; requirements.
30 CFR 77.1710(i) · Significant and substantial (S&S)
Machinery and equipment; operation and maintenance.
30 CFR 77.404(c) · Significant and substantial (S&S)
Regular Safety and Health Inspection
21.0 on-site hours reported
Regular Safety and Health Inspection
14.0 on-site hours reported
Temporary, portable containers.
30 CFR 47.44(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.