← 202501

202501 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Spot Inspection

    inspectionRecord 6904975

    0.0 on-site hours reported

  2. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5116484

    30 CFR 50.30(a)

  3. Mine Idle Activity

    inspectionRecord F03CAEA

    1.0 on-site hours reported

  4. Training plans.

    violationRecord 9487526

    30 CFR 46.3(a) · Significant and substantial (S&S) · $6,540.00 proposed penalty

  5. Site-specific hazard awareness training.

    violationRecord 9487523

    30 CFR 46.11(c) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  6. Spot Inspection

    inspectionRecord F00FCBD

    0.0 on-site hours reported

  7. Requirements for written safety program.

    violationRecord 9487529

    30 CFR 56.23003(a)(1) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  8. Operating speeds and control of equipment.

    violationRecord 9487528

    30 CFR 56.9101 · Significant and substantial (S&S) · $3,448.00 proposed penalty

  9. New task training.

    violationRecord 9487527

    30 CFR 46.7(a) · Significant and substantial (S&S) · $11,450.00 proposed penalty

  10. Requirements for written safety program.

    violationRecord 9487522

    30 CFR 56.23003(a)(1) · Significant and substantial (S&S)

  11. Brakes.

    violationRecord 9487521

    30 CFR 56.14101(a)(3) · Significant and substantial (S&S)

  12. New task training.

    violationRecord 9487520

    30 CFR 46.7(a) · Significant and substantial (S&S)

  13. Immediate notification.

    violationRecord 9487531

    30 CFR 50.10(a) · $7,555.00 proposed penalty

  14. Records of training.

    violationRecord 9487530

    30 CFR 46.9(g) · $151.00 proposed penalty

  15. Notification of commencement of operations and closing of mines.

    violationRecord 9487525

    30 CFR 56.1000 · $151.00 proposed penalty

  16. Immediate notification.

    violationRecord 9487524

    30 CFR 50.10(a) · $7,555.00 proposed penalty

  17. Verbal Hazard Complaint Inspections

    inspectionRecord F024C72

    1.5 on-site hours reported

  18. Powered haulage

    accidentRecord 220252390013

    Fatality

    Accident narrative

    UNKNOWN AT TIME OF REPORT. A miner died when the front-end loader EE was operating went over a highwall and fell approximately 70 feet.

  19. Fatal Accident Investigation

    inspectionRecord F016CD5

    45.8 on-site hours reported

  20. Violation — cited standard not reported

    violationRecord 5117203
Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.