← Yavapai-Apache Nation

Yavapai-Apache Nation safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F027843
    Yavapai Apache Sand & Rock · 0202826

    5.0 on-site hours reported

  2. General instructions for completing MSHA Form 7000-1.

    violationRecord 5230201
    Yavapai Apache Sand & Rock · 0202826

    30 CFR 50.20-1 · $151.00 proposed penalty

  3. Horns and backup alarms.

    violationRecord 5230200
    Yavapai Apache Sand & Rock · 0202826

    30 CFR 56.14132(b) · $151.00 proposed penalty

  4. Regular Safety and Health Inspection

    inspectionRecord F03AD9C
    Yavapai Apache Sand & Rock · 0202826

    7.0 on-site hours reported

  5. Powered haulage

    accidentRecord 220253170144
    Yavapai Apache Sand & Rock · 0202826

    Days away from work only

    Accident narrative

    Employee was operating 631K Scraper. The Employee was going down the hill from the new strip and hit a dip which caused EE to lose EE's footing from the brake peddle which made the scraper accelerate speed going down the hill; when EE reached the bottom of the hill EE was able to stop the scraper but said EE had lower back pain.

  6. Regular Safety and Health Inspection

    inspectionRecord F00FAAB
    Yavapai Apache Sand & Rock · 0202826

    4.3 on-site hours reported

  7. Horns and backup alarms.

    violationRecord 5052037
    Yavapai Apache Sand & Rock · 0202826

    30 CFR 56.14132(a) · $151.00 proposed penalty

  8. Regular Safety and Health Inspection

    inspectionRecord F01054F
    Yavapai Apache Sand & Rock · 0202826

    10.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.