Wayne M Moody safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Regular Safety and Health Inspection
Mansfield Lime & Stone Quarry Inc · 23001298.0 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
Mansfield Lime & Stone Quarry Inc · 230012930 CFR 50.30(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Mansfield Lime & Stone Quarry Inc · 230012930 CFR 56.14100(c) · $151.00 proposed penalty
Securing gas cylinders.
Mansfield Lime & Stone Quarry Inc · 230012930 CFR 56.16005 · $151.00 proposed penalty
Regular Safety and Health Inspection
DBA MT GROVE QUARRY · 23009166.0 on-site hours reported
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
DBA MT GROVE QUARRY · 230091630 CFR 50.30(a) · $151.00 proposed penalty
Construction and maintenance of guards.
DBA MT GROVE QUARRY · 230091630 CFR 56.14112(a)(1) · $151.00 proposed penalty
Protection of gas cylinder valves.
DBA MT GROVE QUARRY · 230091630 CFR 56.16006 · $151.00 proposed penalty
Regular Safety and Health Inspection
Mansfield Lime & Stone Quarry Inc · 230012915.0 on-site hours reported
Records of training.
Mansfield Lime & Stone Quarry Inc · 230012930 CFR 46.9(c)(1)(iii) · $151.00 proposed penalty
Correction of dangerous conditions.
Mansfield Lime & Stone Quarry Inc · 230012930 CFR 56.12030 · $151.00 proposed penalty
Regular Safety and Health Inspection
DBA MT GROVE QUARRY · 23009168.0 on-site hours reported
Identification of power switches.
DBA MT GROVE QUARRY · 230091630 CFR 56.12018 · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
DBA MT GROVE QUARRY · 230091630 CFR 56.12008 · $151.00 proposed penalty
Moving machine parts.
DBA MT GROVE QUARRY · 230091630 CFR 56.14107(a) · Significant and substantial (S&S) · $177.00 proposed penalty
Slip or fall of person
DBA MT GROVE QUARRY · 2300916No dys awy frm wrk,no rstr act
Accident narrative
Exiting water truck when knee gave way and lost footing. Heard and felt knee pop out of place and could not put weight on it.
Special Emphasis Programs
Mansfield Lime & Stone Quarry Inc · 23001291.0 on-site hours reported
Special Emphasis Programs
DBA MT GROVE QUARRY · 23009161.0 on-site hours reported
Compliance Follow-up Inspection
DBA MT GROVE QUARRY · 23009166.0 on-site hours reported
Regular Safety and Health Inspection
Mansfield Lime & Stone Quarry Inc · 230012910.5 on-site hours reported
Damaged or deteriorated explosive material.
DBA MT GROVE QUARRY · 230091630 CFR 56.6900 · $151.00 proposed penalty
Regular Safety and Health Inspection
DBA MT GROVE QUARRY · 230091623.5 on-site hours reported
Compliance Follow-up Inspection
DBA MT GROVE QUARRY · 23009161.0 on-site hours reported
Safety defects; examination, correction and records.
DBA MT GROVE QUARRY · 230091630 CFR 56.14100(b) · $151.00 proposed penalty
Written safety program.
DBA MT GROVE QUARRY · 230091630 CFR 56.23002(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.