← Warrior Met Coal Intermediate Holdco LLC

Warrior Met Coal Intermediate Holdco LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Escapeways; bituminous and lignite mines.

    violationRecord 5062671
    No 7 Mine · 0101401

    30 CFR 75.380(d)(7)(iv) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  2. Protection from falls of roof, face and ribs.

    violationRecord 9825969
    Blue Creek Mine No. 1 · 0103448

    30 CFR 75.202(a) · $245.00 proposed penalty

  3. Ventilation controls.

    violationRecord 9825968
    Blue Creek Mine No. 1 · 0103448

    30 CFR 75.333(c) · $151.00 proposed penalty

  4. Escapeways; bituminous and lignite mines.

    violationRecord 9825967
    Blue Creek Mine No. 1 · 0103448

    30 CFR 75.380(d)(7)(vii)(A) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  5. Escapeways; bituminous and lignite mines.

    violationRecord 9825966
    Blue Creek Mine No. 1 · 0103448

    30 CFR 75.380(d)(7)(vii)(B) · $226.00 proposed penalty

  6. Protection from falls of roof, face and ribs.

    violationRecord 9825965
    Blue Creek Mine No. 1 · 0103448

    30 CFR 75.202(a) · $245.00 proposed penalty

  7. Maintenance of incombustible content of rock dust.

    violationRecord 9828922
    Blue Creek Mine No. 1 · 0103448

    30 CFR 75.403 · $549.00 proposed penalty

  8. Quantity and location of firefighting equipment.

    violationRecord 9821772
    Blue Creek Mine No. 1 · 0103448

    30 CFR 77.1109(d) · $151.00 proposed penalty

  9. Protection from falls of roof, face and ribs.

    violationRecord 9828921
    No 7 Mine · 0101401

    30 CFR 75.202(a) · $398.00 proposed penalty

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9828920
    No 7 Mine · 0101401

    30 CFR 75.1731(a) · $245.00 proposed penalty

  11. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9824183
    No 7 Mine · 0101401

    30 CFR 75.1731(c) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  12. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9824182
    No 7 Mine · 0101401

    30 CFR 75.1731(a) · $366.00 proposed penalty

  13. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9824181
    No 7 Mine · 0101401

    30 CFR 75.1731(b) · $336.00 proposed penalty

  14. Weekly examination.

    violationRecord 9822541
    No 7 Mine · 0101401

    30 CFR 75.364(g) · $151.00 proposed penalty

  15. Roof bolting.

    violationRecord 5062670
    Blue Creek Mine No. 1 · 0103448

    30 CFR 75.204(c)(1) · $151.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 5062669
    Blue Creek Mine No. 1 · 0103448

    30 CFR 75.202(a) · $245.00 proposed penalty

  17. Ventilation controls.

    violationRecord 5062668
    Blue Creek Mine No. 1 · 0103448

    30 CFR 75.333(h) · $151.00 proposed penalty

  18. Ventilation controls.

    violationRecord 5062667
    Blue Creek Mine No. 1 · 0103448

    30 CFR 75.333(h) · $151.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 9757515
    No 4 Mine · 0101247

    30 CFR 75.400 · $432.00 proposed penalty

  20. Roof control plan.

    violationRecord 9828919
    No 7 Mine · 0101401

    30 CFR 75.220(a)(1) · $398.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 9828918
    No 7 Mine · 0101401

    30 CFR 75.202(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty

  22. Quantity and location of firefighting equipment.

    violationRecord 9822540
    No 7 Mine · 0101401

    30 CFR 75.1100-2(b) · $151.00 proposed penalty

  23. Slip or fall of person

    accidentRecord 220253170290
    No 4 Mine · 0101247

    Days away from work only

    Accident narrative

    Employee had finished filling a tank for the rotary breaker oilers in the Prep Plant, when EE stepped off the platform and EE's right knee gave out and EE felt a pop causing a sprain to EE's right knee which later resulted in meniscus tears to the knee. (STARTED LOSING TIME ON 10/15/2025 DUE TO SURGERY)

  24. Spot Inspections

    inspectionRecord 6974493
    No 7 Mine · 0101401

    103(i) · 5.0 on-site hours reported

  25. Roof control plan.

    violationRecord 9824180
    Blue Creek Mine No. 1 · 0103448

    30 CFR 75.220(a)(1) · $245.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.