← Warrior Met Coal Intermediate Holdco LLC

Warrior Met Coal Intermediate Holdco LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 5190063
    No 4 Mine · 0101247

    30 CFR 75.1911(c) · $288.00 proposed penalty

  2. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 5190062
    No 4 Mine · 0101247

    30 CFR 75.1911(a)(3) · $288.00 proposed penalty

  3. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 5190061
    No 4 Mine · 0101247

    30 CFR 75.1714-3(a) · $288.00 proposed penalty

  4. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5062736
    No 4 Mine · 0101247

    30 CFR 75.1910(f) · $288.00 proposed penalty

  5. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5062735
    No 4 Mine · 0101247

    30 CFR 75.1909(a)(10) · $288.00 proposed penalty

  6. Other safeguards.

    violationRecord 5062733
    No 4 Mine · 0101247

    30 CFR 75.1403 · $313.00 proposed penalty

  7. Criteria—Self-propelled personnel carriers.

    violationRecord 5062732
    No 4 Mine · 0101247

    30 CFR 75.1403-6(b)(1) · $288.00 proposed penalty

  8. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5062731
    No 4 Mine · 0101247

    30 CFR 75.1910(i) · $226.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5062730
    No 4 Mine · 0101247

    30 CFR 75.400 · $549.00 proposed penalty

  10. Other safeguards.

    violationRecord 5062729
    No 4 Mine · 0101247

    30 CFR 75.1403 · $313.00 proposed penalty

  11. Protection from falls of roof, face and ribs.

    violationRecord 9822571
    No 7 Mine · 0101401

    30 CFR 75.202(a) · $398.00 proposed penalty

  12. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9828252
    No 7 Mine · 0101401

    30 CFR 75.1731(b) · Significant and substantial (S&S) · $549.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 9828251
    No 7 Mine · 0101401

    30 CFR 75.400 · Significant and substantial (S&S) · $2,312.00 proposed penalty

  14. Roof control plan.

    violationRecord 5068855
    No 7 Mine · 0101401

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  15. Protection from falls of roof, face and ribs.

    violationRecord 5068854
    No 7 Mine · 0101401

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 5068853
    No 7 Mine · 0101401

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  17. Escapeways; bituminous and lignite mines.

    violationRecord 5068852
    No 7 Mine · 0101401

    30 CFR 75.380(d)(7)(vi) · $336.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5062728
    No 4 Mine · 0101247

    30 CFR 75.400 · $549.00 proposed penalty

  19. Ventilation controls.

    violationRecord 5062727
    No 4 Mine · 0101247

    30 CFR 75.333(c)(2) · $288.00 proposed penalty

  20. Escapeways; bituminous and lignite mines.

    violationRecord 5062726
    No 4 Mine · 0101247

    30 CFR 75.380(d)(7)(vi) · $288.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 5062725
    No 4 Mine · 0101247

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  22. Ventilation controls.

    violationRecord 5062724
    No 4 Mine · 0101247

    30 CFR 75.333(c)(3) · $288.00 proposed penalty

  23. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5062723
    No 4 Mine · 0101247

    30 CFR 75.1910(f) · $288.00 proposed penalty

  24. Maintenance of diesel-powered equipment.

    violationRecord 5062722
    No 4 Mine · 0101247

    30 CFR 75.1914(a) · $288.00 proposed penalty

  25. Spot Inspections

    inspectionRecord F014C18
    No 4 Mine · 0101247

    103(i) · 7.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.