Spot Inspections
No 7 Mine · 0101401103(i) · 9.3 on-site hours reported
Spot Inspections
Blue Creek Mine No. 1 · 0103448103(i) · 7.0 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
No 4 Mine · 010124730 CFR 75.1731(a) · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
No 4 Mine · 010124730 CFR 75.202(a) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
No 7 Mine · 010140130 CFR 75.1731(a) · $267.00 proposed penalty
Accumulation of combustible materials.
No 7 Mine · 010140130 CFR 75.400 · $465.00 proposed penalty
Condition and examination of firefighting equipment.
No 7 Mine · 010140130 CFR 75.1100-3 · $245.00 proposed penalty
Roof control plan.
No 7 Mine · 010140130 CFR 75.220(a)(1) · $398.00 proposed penalty
Communications facilities; refuge alternatives.
Blue Creek Mine No. 1 · 010344830 CFR 75.1600-3(a)(2) · $209.00 proposed penalty
Quarterly sampling; mechanized mining units.
Blue Creek Mine No. 1 · 010344830 CFR 70.208(a)(2) · $465.00 proposed penalty
Quarterly sampling; mechanized mining units.
Blue Creek Mine No. 1 · 010344830 CFR 70.208(a)(2) · $465.00 proposed penalty
Quarterly sampling; mechanized mining units.
Blue Creek Mine No. 1 · 010344830 CFR 70.208(a)(2) · $313.00 proposed penalty
Quarterly sampling; mechanized mining units.
Blue Creek Mine No. 1 · 010344830 CFR 70.208(a)(1) · $465.00 proposed penalty
Protection from falls of roof, face and ribs.
No 4 Mine · 010124730 CFR 75.202(a) · $465.00 proposed penalty
Exploding vessels under pressure
No 7 Mine · 0101401No dys awy frm wrk,no rstr act
Accident narrative
REPORTABLE DUE TO SUTURES - Employee was working on an eight-inch Aqua-mine discharge pipe on NE-9 in the #1 Entry at XC #50 when it burst striking the employee on the left side of the body causing a laceration to the left ear and a laceration to the left upper arm which required sutures to both locations.
Identification of circuit breakers.
Blue Creek Mine No. 1 · 010344830 CFR 77.904 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Verbal Hazard Complaint Inspections
No 7 Mine · 01014017.0 on-site hours reported
Mechanical equipment guards.
No 4 Mine · 010124730 CFR 77.400(a) · $366.00 proposed penalty
Mechanical equipment guards.
No 4 Mine · 010124730 CFR 77.400(a) · $366.00 proposed penalty
Mechanical equipment guards.
No 4 Mine · 010124730 CFR 77.400(d) · $366.00 proposed penalty
Accumulation of combustible materials.
No 7 Mine · 010140130 CFR 75.400 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Roof control plan.
No 7 Mine · 010140130 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Protection from falls of roof, face and ribs.
No 4 Mine · 010124730 CFR 75.202(a) · $465.00 proposed penalty
Accumulation of combustible materials.
No 4 Mine · 010124730 CFR 75.400 · $1,219.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
No 4 Mine · 010124730 CFR 75.1731(a) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.