Certified person; sampling.
No 7 Mine · 010140130 CFR 70.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Spot Inspections
No 7 Mine · 0101401103(i) · 6.5 on-site hours reported
Communications facilities; refuge alternatives.
No 4 Mine · 010124730 CFR 75.1600-3(a)(2) · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
No 4 Mine · 010124730 CFR 75.202(a) · $504.00 proposed penalty
Protection from falls of roof, face and ribs.
No 4 Mine · 010124730 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Protection from falls of roof, face and ribs.
No 7 Mine · 010140130 CFR 75.202(a) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Ventilation controls.
No 7 Mine · 010140130 CFR 75.333(c)(3) · $245.00 proposed penalty
Mechanical equipment guards.
No 7 Mine · 010140130 CFR 77.400(a) · $366.00 proposed penalty
Surface installations; general.
No 7 Mine · 010140130 CFR 77.200 · $1,219.00 proposed penalty
Insulating mats at power switches.
No 7 Mine · 010140130 CFR 77.513 · $245.00 proposed penalty
Examination and maintenance of firefighting equipment.
No 7 Mine · 010140130 CFR 77.1110 · $245.00 proposed penalty
Surface installations; general.
No 7 Mine · 010140130 CFR 77.200 · $1,219.00 proposed penalty
Insulating mats at power switches.
No 7 Mine · 010140130 CFR 77.513 · $818.00 proposed penalty
Accumulations of combustible materials.
No 7 Mine · 010140130 CFR 77.1104 · $245.00 proposed penalty
Storage of materials.
Blue Creek Mine No. 1 · 010344830 CFR 77.208(e) · $313.00 proposed penalty
Accumulation of combustible materials.
No 7 Mine · 010140130 CFR 75.400 · $465.00 proposed penalty
Accumulation of combustible materials.
No 7 Mine · 010140130 CFR 75.400 · $465.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
No 7 Mine · 010140130 CFR 77.502 · $245.00 proposed penalty
Mechanical equipment guards.
No 7 Mine · 010140130 CFR 77.400(d) · $366.00 proposed penalty
Surface installations; general.
No 7 Mine · 010140130 CFR 77.200 · $549.00 proposed penalty
Maximum load; posting.
No 7 Mine · 010140130 CFR 77.1402-1 · $366.00 proposed penalty
Daily examination of hoisting equipment.
No 7 Mine · 010140130 CFR 77.1403 · $818.00 proposed penalty
Machinery and equipment; operation and maintenance.
No 7 Mine · 010140130 CFR 77.404(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
No 7 Mine · 010140130 CFR 77.502 · $818.00 proposed penalty
Ignition or explosion of gas or dust
No 7 Mine · 0101401Accident only
Accident narrative
IGNITION - Occurred while doing repairs with an oxygen and acetylene torch in the 7/3 Service Shaft, approx. 1,153 feet down the shaft at 7 West. They ignited a bleeder which burned approx. 45 seconds and was extinguished with gallon container of water.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.