← Warrior Met Coal Intermediate Holdco LLC

Warrior Met Coal Intermediate Holdco LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Loading and haulage equipment; operation.

    violationRecord 5192010
    No 7 Mine · 0101401

    30 CFR 77.1607(i) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  2. Spot Inspections

    inspectionRecord F026FA7
    No 7 Mine · 0101401

    103(i) · 2.5 on-site hours reported

  3. Ventilation controls.

    violationRecord 5192809
    No 4 Mine · 0101247

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  4. Roof control plan.

    violationRecord 5061970
    No 4 Mine · 0101247

    30 CFR 75.220(a)(1) · $465.00 proposed penalty

  5. Mechanical equipment guards.

    violationRecord 5061969
    No 4 Mine · 0101247

    30 CFR 75.1722(b) · $245.00 proposed penalty

  6. Escapeway maps.

    violationRecord 5061968
    No 4 Mine · 0101247

    30 CFR 75.1505(b) · $151.00 proposed penalty

  7. Mining methods.

    violationRecord 5061967
    No 4 Mine · 0101247

    30 CFR 75.203(e)(1) · $245.00 proposed penalty

  8. Protection from falls of roof, face and ribs.

    violationRecord 9757543
    No 7 Mine · 0101401

    30 CFR 75.202(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  9. Spot Inspections

    inspectionRecord F026593
    No 4 Mine · 0101247

    103(i) · 6.0 on-site hours reported

  10. Spot Inspections

    inspectionRecord F02F15E
    Blue Creek Mine No. 1 · 0103448

    103(i) · 7.5 on-site hours reported

  11. Ventilation controls.

    violationRecord 9757542
    No 7 Mine · 0101401

    30 CFR 75.333(c) · $245.00 proposed penalty

  12. Roof control plan.

    violationRecord 5192651
    No 4 Mine · 0101247

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 5192650
    No 4 Mine · 0101247

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  14. Methane monitors.

    violationRecord 5191262
    No 7 Mine · 0101401

    30 CFR 75.342(a)(4) · $245.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 5191261
    No 7 Mine · 0101401

    30 CFR 75.370(a)(1) · $267.00 proposed penalty

  16. Machinery and equipment; operation and maintenance.

    violationRecord 5192009
    No 7 Mine · 0101401

    30 CFR 77.404(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  17. Electric equipment; examination, testing, and maintenance.

    violationRecord 5192008
    No 7 Mine · 0101401

    30 CFR 77.502 · $818.00 proposed penalty

  18. Electric equipment; examination, testing, and maintenance.

    violationRecord 5192007
    No 7 Mine · 0101401

    30 CFR 77.502 · $818.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F024071
    No 7 Mine · 0101401

    103(i) · 5.5 on-site hours reported

  20. Roof control plan.

    violationRecord 5192649
    No 4 Mine · 0101247

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  21. Machinery and equipment; operation and maintenance.

    violationRecord 5192648
    No 4 Mine · 0101247

    30 CFR 75.1725(a) · $151.00 proposed penalty

  22. Protection from falls of roof, face and ribs.

    violationRecord 5192647
    No 4 Mine · 0101247

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  23. Weekly examination.

    violationRecord 5192646
    No 4 Mine · 0101247

    30 CFR 75.364(h) · $151.00 proposed penalty

  24. Other safeguards.

    violationRecord 5192006
    No 7 Mine · 0101401

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,550.00 proposed penalty

  25. Machinery and equipment; operation and maintenance.

    violationRecord 5192005
    No 7 Mine · 0101401

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.