Warrior Met Coal Intermediate Holdco LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
No 7 Mine · 010140130 CFR 75.400 · $336.00 proposed penalty
Roof Control Technical Investigation
Blue Creek Mine No. 1 · 010344847.3 on-site hours reported
Spot Inspections
Blue Creek Mine No. 1 · 0103448103(i) · 8.0 on-site hours reported
Permissible electric face equipment; maintenance.
No 4 Mine · 010124730 CFR 75.503 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Roof control plan.
No 4 Mine · 010124730 CFR 75.220(a)(1) · $465.00 proposed penalty
Maintenance of diesel-powered equipment.
No 7 Mine · 010140130 CFR 75.1914(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Ventilation controls.
No 7 Mine · 010140130 CFR 75.333(d)(3) · $193.00 proposed penalty
Ventilation controls.
No 7 Mine · 010140130 CFR 75.333(c)(3) · $193.00 proposed penalty
Protection from falls of roof, face and ribs.
No 7 Mine · 010140130 CFR 75.202(a) · $465.00 proposed penalty
Ventilation controls.
No 7 Mine · 010140130 CFR 75.333(b)(1) · $193.00 proposed penalty
Accumulation of combustible materials.
Blue Creek Mine No. 1 · 010344830 CFR 75.400 · $818.00 proposed penalty
Mechanical equipment guards.
No 7 Mine · 010140130 CFR 77.400(a) · Significant and substantial (S&S) · $549.00 proposed penalty
Travelways at surface installations.
No 7 Mine · 010140130 CFR 77.205(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Surface installations; general.
No 7 Mine · 010140130 CFR 77.200 · $818.00 proposed penalty
Mechanical equipment guards.
No 7 Mine · 010140130 CFR 77.400(d) · $288.00 proposed penalty
Surface installations; general.
No 7 Mine · 010140130 CFR 77.200 · $245.00 proposed penalty
Travelways at surface installations.
No 7 Mine · 010140130 CFR 77.205(b) · Significant and substantial (S&S) · $959.00 proposed penalty
Travelways at surface installations.
No 7 Mine · 010140130 CFR 77.205(a) · Significant and substantial (S&S) · $959.00 proposed penalty
Roof bolting.
No 4 Mine · 010124730 CFR 75.204(c)(1) · $267.00 proposed penalty
Accumulation of combustible materials.
No 7 Mine · 010140130 CFR 75.400 · $151.00 proposed penalty
Spot Inspections
No 7 Mine · 0101401103(i) · 8.0 on-site hours reported
Protection from falls of roof, face and ribs.
No 4 Mine · 010124730 CFR 75.202(a) · $504.00 proposed penalty
Ventilation controls.
No 4 Mine · 010124730 CFR 75.333(c)(3) · $245.00 proposed penalty
Roof bolting.
No 4 Mine · 010124730 CFR 75.204(c)(1) · $267.00 proposed penalty
Escapeways; bituminous and lignite mines.
No 4 Mine · 010124730 CFR 75.380(d)(7)(vi) · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.