Warrior Met Coal Intermediate Holdco LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Travelways at surface installations.
No 7 Mine · 010140130 CFR 77.205(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Surface installations; general.
No 7 Mine · 010140130 CFR 77.200 · $245.00 proposed penalty
Handling of materials
No 7 Mine · 0101401Days away from work only
Accident narrative
Employee was assisting with installing a bull hose on a 8" Aqua pipe for electric pump on NE-9, when employee lost balance and fell into the water and the 8" Aqua pipe fell on their left foot/ankle causing it to become caught between the mine floor and pipe, resulting in a sprain to their left foot/ankle.
Spot Inspections
No 4 Mine · 0101247103(i) · 5.8 on-site hours reported
Verbal Hazard Complaint Inspections
No 4 Mine · 01012475.0 on-site hours reported
Spot Inspections
No 7 Mine · 0101401103(i) · 3.0 on-site hours reported
Electric equipment; examination, testing, and maintenance.
No 4 Mine · 010124730 CFR 77.502 · $288.00 proposed penalty
Maintenance of diesel-powered equipment.
No 4 Mine · 010124730 CFR 75.1914(a) · $288.00 proposed penalty
Machinery and equipment; operation and maintenance.
No 4 Mine · 010124730 CFR 75.1725(a) · $465.00 proposed penalty
Protection from falls of roof, face and ribs.
No 4 Mine · 010124730 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Mechanical equipment guards.
No 4 Mine · 010124730 CFR 77.400(d) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Mechanical equipment guards.
No 4 Mine · 010124730 CFR 77.400(d) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Ventilation controls.
No 7 Mine · 010140130 CFR 75.333(c)(3) · $226.00 proposed penalty
Impoundment Spot Inspection
No 4 Mine · 010124711.0 on-site hours reported
103 (g) Written Notification Hazard Complaint Inspectio
No 7 Mine · 01014016.5 on-site hours reported
Supplemental support materials, equipment and tools.
No 4 Mine · 010124730 CFR 75.214(b) · $288.00 proposed penalty
Machinery and equipment; operation and maintenance.
No 4 Mine · 010124730 CFR 75.1725(a) · $465.00 proposed penalty
Roof control plan.
No 4 Mine · 010124730 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Preshift examination at fixed intervals.
No 4 Mine · 010124730 CFR 75.360(f) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Roof control plan.
No 4 Mine · 010124730 CFR 75.220(a)(1) · $592.00 proposed penalty
Accumulation of combustible materials.
No 7 Mine · 010140130 CFR 75.400 · $465.00 proposed penalty
Accumulation of combustible materials.
No 7 Mine · 010140130 CFR 75.400 · $432.00 proposed penalty
Permissible electric face equipment; maintenance.
No 4 Mine · 010124730 CFR 75.503 · $366.00 proposed penalty
Roof control plan.
No 4 Mine · 010124730 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Accumulation of combustible materials.
No 4 Mine · 010124730 CFR 75.400 · $642.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.