Construction and maintenance of ladders.
Georgetown Qy & Plt · 410006930 CFR 56.11003 · $366.00 proposed penalty
Brakes.
Georgetown Qy & Plt · 410006930 CFR 56.14101(a)(2) · Significant and substantial (S&S) · $20,047.00 proposed penalty
Inspection and cover plates.
Georgetown Qy & Plt · 410006930 CFR 56.12032 · Significant and substantial (S&S) · $6,037.00 proposed penalty
Electrical conductors.
Georgetown Qy & Plt · 410006930 CFR 56.12004 · Significant and substantial (S&S) · $23,525.00 proposed penalty
Heat sources.
Georgetown Qy & Plt · 410006930 CFR 56.4500 · $549.00 proposed penalty
Requirement for container labels.
Georgetown Qy & Plt · 410006930 CFR 47.41(a) · $366.00 proposed penalty
Regular Safety and Health Inspection
Georgetown Qy & Plt · 410006983.0 on-site hours reported
Striking or bumping
Georgetown Qy & Plt · 4100069No dys awy frm wrk,no rstr act
Accident narrative
Employee was working on 154 plant weather was sunny temp was 82 degrees. the plant was clean of debris. Employee was bent over went to stand struck head on I-beam
All other occupational illnesses
Georgetown Qy & Plt · 4100069Occupatnal illness not deg 1-6
Accident narrative
10/10/25 around 9:50am nice day sunny temp was 70dgrees. blasting crew was setting off a shot when fly rock struck the blast shelter and scared EE into a panic attack.
Waste receptacles.
Georgetown Qy & Plt · 410006930 CFR 56.20013 · $226.00 proposed penalty
Requirement for container labels.
Georgetown Qy & Plt · 410006930 CFR 47.41(a) · $288.00 proposed penalty
Warning signs.
Georgetown Qy & Plt · 410006930 CFR 56.4101 · $288.00 proposed penalty
Horns and backup alarms.
Georgetown Qy & Plt · 410006930 CFR 56.14132(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Temporary, portable containers.
Georgetown Qy & Plt · 410006930 CFR 47.44(b) · $288.00 proposed penalty
Parking procedures for unattended equipment.
Georgetown Qy & Plt · 410006930 CFR 56.14207 · $288.00 proposed penalty
Temporary, portable containers.
Georgetown Qy & Plt · 410006930 CFR 47.44(b) · $288.00 proposed penalty
Requirement for container labels.
Georgetown Qy & Plt · 410006930 CFR 47.41(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Georgetown Qy & Plt · 410006930 CFR 56.14100(c) · $151.00 proposed penalty
Electrical conductors.
Georgetown Qy & Plt · 410006930 CFR 56.12004 · $465.00 proposed penalty
Requirement for container labels.
Georgetown Qy & Plt · 410006930 CFR 47.41(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Georgetown Qy & Plt · 410006943.5 on-site hours reported
Securing movable parts.
Georgetown Qy & Plt · 410006930 CFR 56.14206(b) · $366.00 proposed penalty
Parking procedures for unattended equipment.
Georgetown Qy & Plt · 410006930 CFR 56.14207 · $165.00 proposed penalty
Safety defects; examination, correction and records.
Georgetown Qy & Plt · 410006930 CFR 56.14100(b) · $165.00 proposed penalty
Handling of materials
Georgetown Qy & Plt · 4100069No dys awy frm wrk,no rstr act
Accident narrative
EE was filling hydraulic oil in 651 scraper when hand got smashed by the 55 gal. drum. weather 79 degrees wind was blowing 3mph.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.